Permit: T08CM02847
Permit Details
Apply Date:
08/21/2008
Applicant:
N/A
Description:
TI: RESTAURANT
Contractors:
- HAWORTH CORPORATION , THE
Permit Reviews
Permit Number - T08CM02847
Permit Status: C of o
Permit Description: TI: RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/13/2009 | 3RD PARTY REVIEW-REVISION/OTHER | 01/23/2009 | COMPLETED |
08/21/2008 | PLANS OK TO SUBMIT - 3RD PARTY | 08/22/2008 | COMPLETED |
08/22/2008 | 3RD PARTY REVIEW-COMMERCIAL TI | 10/07/2008 | COMPLETED |
08/28/2008 | POST 3RD PARTY REVIEW | 12/16/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM02847
Permit Status: C of o
Permit Description: TI: RESTAURANT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/21/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T08CM02847
Permit Description: TI: RESTAURANT
Total Completed Inspections - 41
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | IVR USER | Approved | IVRS - RI canceled |
11/17/2008 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* SHAWN @ 602-332-2052 WATER TEST DWV & GREASE WASTE THRU BLD. TO EXISTING POINT OF CONNECTION OK |
11/19/2008 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* REVISED PLANS DATED 9/24/08 -- SLAB AT PER REVISED PLANS -- OK TO POUR |
11/19/2008 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
12/03/2008 | MECHANICAL - PROGRESS | JMILITEL | Approved | IVRS - Inspection :* OK TO INSULATE DUCTS INSTALL FLEX DUCTS PER DETAIL ON PLANS USE ONLY UL181 LISTED TAPE AND METAL BANDS SUPERINTENDENT: SEAN |
12/08/2008 | BUILDING - PROGRESS | GDABBS | Approved | IVRS - Inspection :* |
12/10/2008 | MECHANICAL - HOOD SYSTEMS | JMILITEL | Approved | IVRS - Inspection :* CHECKED 1ST LAYER OF FIRE WRAP OK FOR 2ND LAYER PROVIDE HEAT SENSORS IN EXHAUST DUCTS |
12/11/2008 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection :* FIRE WRAP OK OK TO SHEETROCK HARD LIDS AND SOFFITS |
12/11/2008 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* 1. FAN BOXES TO BE LISTED FOR USE FOR FANS 2. PIPES ABOVE PANEL IN EQUIPMENT DEDICATED SPACE NEED TO BE MOVED - NEC 110.26 3. OK WALLS AND HARD LIDS MAKE CORRECTION AS ABOVE |
12/11/2008 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
12/11/2008 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
12/12/2008 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* TEST ON GAS PIPING FROM METER TO CAPS AT APPLIANCES THRU ANSUL VALVE 1. NEED INSTALLATION OF SLEEVING ON GAS PIPING PER PLAN WITH DETAIL FOR HOW TO 2. NEED RETEST WHEN VALVES ARE INSTALLED WITH CONTINUATION TO ROOFTOP UNIT. |
12/16/2008 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* IN WALL INSULATION OK |
12/22/2008 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO TAPE THROUGHOUT -- ALL CEILINGS ARE COMPLETE |
01/02/2009 | PLUMBING - ABOVE CEILING | BBENEDON | Approved | IVRS - Inspection :* |
01/07/2009 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* OK TO SET CEILING TILES |
01/07/2009 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
01/07/2009 | STUCCO MESH | JBURGE | Approved | IVRS - Inspection :* |
01/16/2009 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED FOR #E04 PER R. JIROUDEK |
01/21/2009 | PLUMBING - GAS PRESS TEST FNL | RRICH | Approved | IVRS - Inspection :* PLEASE READ ALL NOTES, CALL IN ALL PLUMBING INSPECTIONS FOR APPROVAL PRIOR TO FINAL INSPECTION. |
01/22/2009 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* EXTEND AIR INTAKE VENT FOR WATER HEATER AS PER INSTALL INSTRUCTIONS |
01/22/2009 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
01/27/2009 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
01/27/2009 | FIRE - KITCHEN EXH HOOD FINAL | CSCHULTZ | Approved | |
01/27/2009 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | |
01/27/2009 | FIRE - FINAL | CSCHULTZ | Approved | |
01/28/2009 | PLUMBING - FINAL | RRICH | Approved | COMPLETE ALL ITEMS LISTED ON 1/27/09 |
01/28/2009 | PLUMBING - FINAL | RRICH | Approved | AFTER HRS. INSP. PAID CHECK#02610 - $150.00 CORRECTIONS MADE |
01/28/2009 | PLUMBING - PROGRESS | RRICH | Approved | |
01/28/2009 | PLUMBING - GAS RECONNECT | RRICH | Approved | |
01/28/2009 | NPPO - FINAL | ACONNOR | Approved | N/A |
01/28/2009 | LANDSCAPE - FINAL | ACONNOR | Approved | N/A |
01/28/2009 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
01/28/2009 | ELECTRIC - PROGRESS | RJIROUDE | Approved | IVRS - Inspection :* |
01/28/2009 | ELECTRIC - TEMP POWER FOR TEST | RJIROUDE | Approved | IVRS - Inspection :* |
01/29/2009 | ENGINEERING - FINAL | NKALAHAR | Approved | AP GAVE SHAWN 602 992 2052 CONTACT INFO FOR SIGNS |
01/29/2009 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
01/29/2009 | ENGINEERING - FINAL | NKALAHAR | Approved | CLEAN UP AROUND DUMPSTERS WAIT FOR PAINTERS TO FINISH |
01/30/2009 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
01/30/2009 | SIGN - FINAL | LHANLY | Approved | permits obtained for door signs. other sign on separate permit not part of this work shall have inspections done as part of separate permit. |
01/30/2009 | HEALTH DEPT - FINAL 724-7908 | LGERINGER | Approved |