Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2009 | PLUMBING - FINAL | Approved | AFTER HRS. INSP. PAID CHECK#02610 - $150.00 CORRECTIONS MADE |
|
| 01/28/2009 | PLUMBING - FINAL | Not ready for Inspection | COMPLETE ALL ITEMS LISTED ON 1/27/09 | |
| 01/27/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CLOSET FLANGES OK CALL IN ALL PLUMBING INSPECTIONS 1. SECURE TEMPERING VALVES AT LAVS 2. INSTALL SAFETY CABLES ON GAS APPLIANCES WITH WHEELS 3. MAKE ALL FIXTURES WATER TIGHT 4. PROVIDE APPROVED CLEANOUT PLUGS FACTORY TAPPED WITH MACHINE SCREWS FOR CLEANOUT COVERS 5. ALL INDIRECT DRAINS TO HAVE MINIMUM 1" AIR GAP AT TERMINATIONS 6. SUPPORT PIPING & RPB AT ICE MACHINE 7. PROVIDE CORRECT DRAIN CONNECTION FOR 4-BOWL OF SINK 8. PROVIDE APPROVED DRAINAGE FOR SOFTENER 9. PROVIDE CORRECT DRAIN FOR SODA DISPENSER 10. PROVIDE CHLORINE & BACTERIA REPORT FOR POTABLE WATER SYSTEM |