Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
126 E ALAMEDA ST
Address NEW:
126 E ALAMEDA ST
Apply Date:
05/05/2008
Applicant:
N/A
Description:
TEMP POWER & CHILLED WATER PIPING FOR ROLL UP CHILLER PLANT REVISION 2: CHILL WATER LINE SUPPORT
Contractors:
  • BECK

Permit Reviews

Permit Number - T08CM01436
Permit Status: Final
Permit Description: TEMP POWER & CHILLED WATER PIPING FOR ROLL UP CHILLER PLANT REVISION 2: CHILL WATER LINE SUPPORT
Start Date Submittal Complete Date Status  
05/05/2008 OTHER 05/05/2008 COMPLETED Review Details
06/05/2008 OTHER 06/05/2008 COMPLETED Review Details
06/05/2008 RESUBMITTAL 06/18/2008 COMPLETED Review Details
06/18/2008 RESUBMITTAL 07/22/2008 COMPLETED Review Details
07/22/2008 REVISION - - 1ST 08/18/2009 COMPLETED Review Details
08/18/2009 REVISION - - 2ND 09/15/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08CM01436
Permit Status: Final
Permit Description: TEMP POWER & CHILLED WATER PIPING FOR ROLL UP CHILLER PLANT REVISION 2: CHILL WATER LINE SUPPORT
Total Outstanding Activity Conditions - 1
Date Name
05/05/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08CM01436
Permit Description: TEMP POWER & CHILLED WATER PIPING FOR ROLL UP CHILLER PLANT REVISION 2: CHILL WATER LINE SUPPORT
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/11/2008 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
EXTERIOR
1. A GROUNDING ELECTRODE SYSTEM IS NEEDED THERE ARE SEPARATE STRUCTURES
2. IDENTIFY GROUNDING EQUIPMENT CONDUCTORS AT LUGS
3. INSTALL ARC FAULT LABELING
4. SWITCHBOARDS ARE FOR 400A MAX GENERATOR
INPUTS NOT FEED FOR TEMP EQUIPMENT --
NEED NRTL RECERTIFICATION IF CHANGED TO OUTPUT
5. NEED COPIES OF GFI TEST
6. NEED PLANS FOR OUTSIDE SWITCHBOARDS
7. HAVE BUILDING INSPECTOR VERIFY FIRE STOPPING
08/04/2009 MECHANICAL - HYDRONIC PIPING MRAMBER Approved
08/04/2009 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
09/23/2009 ELECTRIC - INTERMEDIATE LHANLY Approved IVRS - Inspection :*

Documents

File Name Document Type  
001__M0.1.TIF CONSTRPLANS VIEW
002__M2.1.TIF CONSTRPLANS VIEW
003__M2.0.TIF CONSTRPLANS VIEW
004__M2.0A.TIF CONSTRPLANS VIEW
005__M5.1.TIF CONSTRPLANS VIEW
006__E0.1.TIF CONSTRPLANS VIEW
007__E0.2.TIF CONSTRPLANS VIEW
008__E1.1.TIF CONSTRPLANS VIEW
009__E2.1.TIF CONSTRPLANS VIEW
010__E2.2.TIF CONSTRPLANS VIEW
011__E2.3.TIF CONSTRPLANS VIEW
012__E2.4.TIF CONSTRPLANS VIEW
013__E2.5.TIF CONSTRPLANS VIEW
001_S1-1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW