Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Address NEW:
2930 N CAMPBELL AV
Apply Date:
03/20/2008
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
SHELL REVISION LETTER OF COMPLETION ONLY TENANT IMPROVEMENT REQUIRED FOR OCCUPANCY
Architects:
  • MORROW, KEVIN THOMAS
Contractors:
  • PRESIDIO CONSTRUCTION COMPANY

Permit Reviews

Permit Number - T08CM00931
Permit Status: Final
Permit Description: SHELL REVISION LETTER OF COMPLETION ONLY TENANT IMPROVEMENT REQUIRED FOR OCCUPANCY
Start Date Submittal Complete Date Status  
02/03/2009 3RD PARTY REVIEW-REVISION/OTHER 02/05/2009 COMPLETED Review Details
03/20/2008 PLANS OK TO SUBMIT - 3RD PARTY 03/26/2008 COMPLETED Review Details
03/26/2008 3RD PARTY REVIEW-COMMERCIAL 05/23/2008 COMPLETED Review Details
05/23/2008 POST 3RD PARTY REVIEW 06/16/2008 COMPLETED Review Details
06/17/2008 RESUBMITTAL 06/27/2008 COMPLETED Review Details
06/27/2008 RESUBMITTAL 07/07/2008 COMPLETED Review Details
07/07/2008 RESUBMITTAL 07/16/2008 COMPLETED Review Details
10/30/2008 3RD PARTY REVIEW-REVISION/OTHER 11/04/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08CM00931
Permit Status: Final
Permit Description: SHELL REVISION LETTER OF COMPLETION ONLY TENANT IMPROVEMENT REQUIRED FOR OCCUPANCY
Total Outstanding Activity Conditions - 1
Date Name
03/20/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08CM00931
Permit Description: SHELL REVISION LETTER OF COMPLETION ONLY TENANT IMPROVEMENT REQUIRED FOR OCCUPANCY
Total Completed Inspections - 35
Date Description Inspector Results Comments
09/11/2008 ELECTRIC - UFER AQUIROZ Approved IVRS - Inspection :*
09/29/2008 PLUMBING - ROUGH, SOIL RMYERS Approved IVRS - Inspection :*
ABS DWV UNDERGROUND
10/03/2008 PLUMBING - PRE SLAB RMYERS Approved IVRS - Inspection :*
1. OK FOR CONCRETE
NOTE: SILFOS'D JOINT REQUIRES 100# TEST
2. WATER SERVICE STUBBED INTO BLDG.
10/10/2008 ELECTRIC - UNDERGROUND RHOLLAND Approved IVRS - Inspection :*
OK PVC FOR SUMP PUMP
10/21/2008 STEM WALL/RETAINING WALL AQUIROZ Approved IVRS - Inspection :*
11/06/2008 REINFORCED MASONRY PRE-GROUT JBURGE Approved IVRS - Inspection :*
SOUTH LOADING DOCK WALL AND TRASH ENCLOSURE ALL TOPPED OUT -- OK TO GROUT & CAP
11/28/2008 ROOF NAILING AQUIROZ Approved IVRS - Inspection :*
12/02/2008 BUILDING PRE-SLAB AQUIROZ Approved IVRS - Inspection :*
POUR BACK CENTER OF FLOOR
12/10/2008 EXT METAL CLIPS/EXT SHEATHING AQUIROZ Approved IVRS - Inspection :*
EXCLUDES STOREFRONT
12/16/2008 SITE - SEWER RRICH Approved IVRS - Inspection :*
1. PER REDLINE ON SITE PAGE A1.01 DELTA 2 REVISION
WHICH WILL NEED CITY APPROVAL.
2. WATER TEST & PERM CAP OK
12/17/2008 EXCAVATION/LAYOUT REBAR & ZON AQUIROZ Approved IVRS - Inspection :*
LOADING DOCK EXTENSION
12/19/2008 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
12/19/2008 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
12/19/2008 PLUMBING - ROOF DRAINS RMYERS Approved IVRS - Inspection :*
ROOF DRAIN HANGERS OVERHEAD OK
WILL SEE TEST AND FINAL PIPING AT A LATER DATE
12/23/2008 FRAMING JBURGE Approved IVRS - Inspection :*
ALL AREAS EXCEPT ROOM #105 (LOCK-UP);
ROOMS #109-110 CEILINGS OK TO SHEETROCK
PROGRESS AREAS
12/23/2008 ELECTRIC - INTERMEDIATE RMORENO Approved IVRS - Inspection :*
EGRESS 117, JANITOR ROOM 114, TRAINING ROOM 112,
LOUNGE FOYER 113, LOUNGE 111, CASH ROOM 106,
MANAGER 104, WALLS ALL OK
12/26/2008 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
1) REPAIR LEAK AT ? FACE PLATE
2) SECURE MID SPAN PIPING AND IN WALL VENT PIPING
12/26/2008 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
1) TEST FROM METER THRU TO CAPS AT ROOF TOP. PLAN SPECS FULL SIZE PIPING THRU ROOF, REDUCTION BELOW ROOF TO ROOF TOP REQUIRES STAMPED SEALED LETTER GIVING ENGINEERS OK FOR THIS. RETEST ENTIRE SYSTEM AFTER APPLIANCE SHUT OFF VALVES IN PLACE
01/20/2009 STUCCO MESH AQUIROZ Approved IVRS - Inspection :*
03/24/2009 PLUMBING - YARD WTR LINE/TEST RMYERS Approved IVRS - Inspection :*
PVC YARDWATER INSTALLED OK
OK TO COVER
04/23/2009 ELECTRIC - CABLE DROP DSANTACR Approved IVRS - Inspection :*
1) NO BOND REQUIRED
2) NOTE: CONTR TO INSURE THAT ONLY AUTHORIZED PERSONS TO HAVE ACCESS TO ELECTRICAL EQUIPMENT ALL RECEPTS FOR CONST. USE TO BE GFI PROTECTED
04/24/2009 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED PER D. SANTACRUZ
05/20/2009 PLUMBING - GAS PRESS TEST FNL BBENEDON Approved IVRS - Inspection :*
05/27/2009 RIGHT OF WAY - FINAL MOTERO Approved PER EMAIL
05/27/2009 NPPO - FINAL ACONNOR Approved N/A
05/27/2009 LANDSCAPE - FINAL ACONNOR Approved N/A
05/29/2009 ENGINEERING - FINAL DROBERTS Approved
05/29/2009 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
06/02/2009 FIRE SPKLR - FINAL LTHOMAS Approved
06/04/2009 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
06/04/2009 FIRE - FINAL LTHOMAS Approved
06/08/2009 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
DUCT SMOKE DETECTOR TEST OK
06/08/2009 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
06/11/2009 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
06/11/2009 BUILDING - FINAL AQUIROZ Approved IVRS - Inspection :*

Documents

File Name Document Type  
None SIGNS VIEW
001__A1.0.TIF CONSTRPLANS VIEW
002__A1.01.TIF CONSTRPLANS VIEW
003__A1.1.TIF CONSTRPLANS VIEW
004__A1.2.TIF CONSTRPLANS VIEW
005__A2.0.TIF CONSTRPLANS VIEW
006__A3.0.TIF CONSTRPLANS VIEW
007__A4.0.TIF CONSTRPLANS VIEW
008__A4.1.TIF CONSTRPLANS VIEW
009__A5.0.TIF CONSTRPLANS VIEW
010__S1.1.TIF CONSTRPLANS VIEW
011__S1.2.TIF CONSTRPLANS VIEW
012__S1.3.TIF CONSTRPLANS VIEW
013__S1.4.TIF CONSTRPLANS VIEW
014__S2.1.TIF CONSTRPLANS VIEW
015__S3.1.TIF CONSTRPLANS VIEW
016__S4.1.TIF CONSTRPLANS VIEW
017__S4.2.TIF CONSTRPLANS VIEW
018__S5.1.TIF CONSTRPLANS VIEW
019__S5.2.TIF CONSTRPLANS VIEW
020__P1.0.TIF CONSTRPLANS VIEW
021__P1.1.TIF CONSTRPLANS VIEW
022__P2.1.TIF CONSTRPLANS VIEW
023__P3.1.TIF CONSTRPLANS VIEW
024__M1.0.TIF CONSTRPLANS VIEW
025__E1.0.TIF CONSTRPLANS VIEW
026__E2.0.TIF CONSTRPLANS VIEW
027__E3.0.TIF CONSTRPLANS VIEW
None CONSTRPLANS VIEW
001_S5.3.TIF CONSTRPLANS VIEW
STRUCCALCS.TIF DOCUMENTS VIEW
TRUSSCALCS DOCUMENTS VIEW
None DOCUMENTS VIEW