Permit: T08CM00931

Parcel: 11205283F


Addresses:

2930 N CAMPBELL AV

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
05/20/2009 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
12/26/2008 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
1) TEST FROM METER THRU TO CAPS AT ROOF TOP. PLAN SPECS FULL SIZE PIPING THRU ROOF, REDUCTION BELOW ROOF TO ROOF TOP REQUIRES STAMPED SEALED LETTER GIVING ENGINEERS OK FOR THIS. RETEST ENTIRE SYSTEM AFTER APPLIANCE SHUT OFF VALVES IN PLACE
12/24/2008 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSTALL PER APPROVED PLAN,PROVIDE REDLINES IF CHANGES ARE MADE, ADDITIONS TO THE PLAN OK
ENGINEERING CHANGES REQUIRE REVISED APPROVED PLANS