Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/26/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) TEST FROM METER THRU TO CAPS AT ROOF TOP. PLAN SPECS FULL SIZE PIPING THRU ROOF, REDUCTION BELOW ROOF TO ROOF TOP REQUIRES STAMPED SEALED LETTER GIVING ENGINEERS OK FOR THIS. RETEST ENTIRE SYSTEM AFTER APPLIANCE SHUT OFF VALVES IN PLACE |
|
| 12/24/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL PER APPROVED PLAN,PROVIDE REDLINES IF CHANGES ARE MADE, ADDITIONS TO THE PLAN OK ENGINEERING CHANGES REQUIRE REVISED APPROVED PLANS |