Permit: T08CM00914
Permit Details
Apply Date:
03/19/2008
Applicant:
N/A
Description:
REMODEL:MARKET:ADDITION:OFFICE R1: PHOTOVOLTAIC PANELS
Architects:
- BEACH, RICHARD A
Contractors:
- CONCORD COMPANIES INC
Permit Reviews
Permit Number - T08CM00914
Permit Status: C of o
Permit Description: REMODEL:MARKET:ADDITION:OFFICE
R1: PHOTOVOLTAIC PANELS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/19/2008 | PLANS OK TO SUBMIT - 3RD PARTY | 03/19/2008 | COMPLETED |
03/19/2008 | 3RD PARTY REVIEW-COMMERCIAL TI | 05/28/2008 | COMPLETED |
05/28/2008 | 3RD PARTY REVIEW-COMMERCIAL TI | 06/13/2008 | COMPLETED |
06/13/2008 | POST 3RD PARTY REVIEW | 07/25/2008 | COMPLETED |
08/28/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 08/28/2008 | COMPLETED |
10/09/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 10/17/2008 | COMPLETED |
11/25/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 12/04/2008 | COMPLETED |
12/18/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 12/23/2008 | COMPLETED |
12/23/2008 | 3RD PARTY REVIEW-REVISION/OTHER-2ND | 12/23/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM00914
Permit Status: C of o
Permit Description: REMODEL:MARKET:ADDITION:OFFICE
R1: PHOTOVOLTAIC PANELS
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/19/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T08CM00914
Permit Description: REMODEL:MARKET:ADDITION:OFFICE
R1: PHOTOVOLTAIC PANELS
Total Completed Inspections - 31
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2008 | STEM WALL/RETAINING WALL | JBURGE | Approved | IVRS - Inspection :* NEW ADDITION PERIMETER WALLS @ 48"; EXCEPT FOR EAST EXISTING WALL (N & S DOWLING AREAS) ELEVATOR SHAFT @ 48"; CHANGES AS PER RFI #17 - OK TO GROUT |
09/19/2008 | ELECTRIC - SERVICE UPGRADE | DSANTACR | Approved | IVRS - Inspection :* EXISTING BLD. NO BOND REQUIRED |
09/22/2008 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* OK UNDERGROUND, NORTH, WEST OF EXISTING BLD. |
09/22/2008 | PLUMBING - SEWER HCS CONNECT | RLEDONNE | Approved | IVRS - Inspection :* |
09/22/2008 | TEP CLEARANCE - AM | BFLORES | Approved | INCR PER D.SANTA CRUZ (CLEAR "B" METER ONLY) |
10/30/2008 | BUILDING PRE-SLAB | MHENSON | Approved | IVRS - Inspection :* 1. NEW ADDITION LEVEL 4.1 TO ELEVATOR 2. NEEDS PLUMBING PRE-SLAB 3. EPOXY REBAR SPECIAL INSPECTED 4. ADD ENTRY #4 BARS |
11/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | MHENSON | Approved | IVRS - Inspection :* 1. FREE STANDING WALL FOOTING BETWEEN BLDG. S VERTS TYPICAL 16' O.C 2. DETAIL SK-24 3. TO BE SPECIAL INSPECTED |
12/02/2008 | REINFORCED MASONRY PRE-GROUT | MHENSON | Approved | IVRS - Inspection :* DOOR 140 TO TOPOUT |
12/12/2008 | FRAMING | MHENSON | Approved | IVRS - Inspection :* CHICKEN WIRE MESH TO OLD ADOBE 3 1/2 LEDGED NAILS WITH WASHERS |
12/17/2008 | ROOF NAILING | MHENSON | Approved | IVRS - Inspection :* |
12/18/2008 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* 1. OK BASEMENT ELEVATOR #104 AREA AND EJECTION PIT ROOM WALLS, UPPER AND LOWER LOBBY HARD LIDS #102, #104, #200 |
12/18/2008 | SHEET ROCK NAILING | MHENSON | Approved | IVRS - Inspection :* 1. OK TO PROGRESS 1ST AND 2ND FLOOR NEW ADDITION 2. 2 LAYERS OF 5/8 ON INSIDE OF ELEVATOR SHAFT 1/2" USED NEED TO REPAIR 3. ROOM 108 - 1 HR FIRE RATING |
12/29/2008 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* 1) WOMEN'S #106 & #202 AND BREAK ROOM #215 IN WALL PIPING OK |
02/09/2009 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* |
02/18/2009 | FIRE - FINAL | DRAMIREZ | Approved | |
02/18/2009 | FIRE SPKLR - FINAL | DRAMIREZ | Approved | |
02/18/2009 | FIRE SPKLR - UG, PIPING, HYDRO | DRAMIREZ | Approved | |
02/24/2009 | SITE - SEWER | RLEDONNE | Approved | IVRS - Inspection :* |
02/24/2009 | PLUMBING - ABOVE CEILING | RLEDONNE | Approved | IVRS - Inspection :* |
04/07/2009 | NPPO - FINAL | ACONNOR | Approved | |
04/07/2009 | LANDSCAPE - FINAL | ACONNOR | Approved | |
04/08/2009 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
04/08/2009 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :* |
04/09/2009 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
04/10/2009 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
04/13/2009 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
04/13/2009 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
04/14/2009 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* 1) RAMP HANDRAILS 1 SIDE ONLY OK PER LEE RAY (HISTORICAL) |
04/14/2009 | ENGINEERING - FINAL | MAVERY | Approved | Installed wheel stops for parking overhang. |
04/14/2009 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | |
04/15/2009 | PERMIT FINALED | JWEATHER | Approved |