Permit: T08CM00170
Permit Details
Apply Date:
01/17/2008
Applicant:
KATHY SOZA
Description:
NEW GYM BLDG
Architects:
- HERZOG, STEVEN PAUL
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
- TUCSON UNIFIED SCHOOL DIST #1 **C
Permit Reviews
Permit Number - T08CM00170
Permit Status: C of o
Permit Description: NEW GYM BLDG
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2008 | PLANS OK TO SUBMIT - 3RD PARTY | 01/17/2008 | COMPLETED |
01/17/2008 | 3RD PARTY REVIEW-COMMERCIAL | 02/06/2008 | COMPLETED |
01/29/2009 | 3RD PARTY REVIEW-REVISION/OTHER | 01/30/2009 | COMPLETED |
02/06/2008 | POST 3RD PARTY REVIEW | 03/04/2008 | COMPLETED |
06/11/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 06/12/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM00170
Permit Status: C of o
Permit Description: NEW GYM BLDG
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/17/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T08CM00170
Permit Description: NEW GYM BLDG
Total Completed Inspections - 42
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2008 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* ALL CONTINUOUS FOOTINGS AND SPREAD FOOTING AT NORTH END OF GYM BLDG. EXCEPT TOE DOWN INTERIOR WALL FOOTINGS TO BE POURED LATER |
09/26/2008 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
10/08/2008 | STEM WALL/RETAINING WALL | GDABBS | Approved | IVRS - Inspection :* REINFORCEMENT STEEL @ FOYER/TREATMENT AREA INCLUDING COLUMN PIERS. SPECIAL INSPECTORS HAVE APPROVED. |
10/09/2008 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* 1) METAL ROOF DECK PUDDLE WELDS AT GYM ROOF ALL EXCEPT SOUTH/EAST CORNER-SPECIAL INSPECTOR HAS ACCEPTED |
10/09/2008 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* 1) FROM SOURCE IN MAIN BLDG TO NEW CONCESSION STAND AND TO 5' FROM NEW GYM BLDG 2) RECEIVED 2 BACTERIA REPORTS FOR THIS PIPING |
10/29/2008 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* WATER TEST UNDERGROUND THRU BLD. TO VERTICAL DROP AT EXTERIOR FOR HCS CONNECTION |
11/19/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* HYDROSTATIC TEST ON UNDERGROUND PIPING OK TO BACKFILL TRENCH |
11/20/2008 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* RECEIVED AUTHORIZATION TO DISCHARGE PCDEQ |
11/20/2008 | SITE - SEWER | RRICH | Approved | IVRS - Inspection :* |
11/21/2008 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* UPPER SECTION OF CMU EXTERIOR WALL @ EAST, WEST, AND SOUTH FROM TOP OF BRICK VENEER TO ROOF |
12/05/2008 | PLUMBING - PRE SLAB | BBENEDON | Approved | IVRS - Inspection :* |
12/08/2008 | ELECTRIC - UNDERGROUND | RMORENO | Approved | IVRS - Inspection :* LOBBY AREA FROM WEST WALL TO EAST WALL 3-3/4 PVC OK |
12/11/2008 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* |
12/12/2008 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* CARRIERS FOR URINALS AND LAVS OK |
12/30/2008 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* 1) MEZZ WALL 8-12 LIFT |
12/30/2008 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* 1) NORTH AND EAST CMU WALLS AT #106 STAIRS AND NORTH & EAST CMU WALLS AT ROOM #104 FROM 8'-8" TO 12'-8" OK TO GROUT SPECIAL INSPECTED |
03/19/2009 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* ALL AREAS OK |
03/19/2009 | PLUMBING - ROOF DRAINS | RRICH | Approved | IVRS - Inspection :* |
04/15/2009 | EXT METAL CLIPS/EXT SHEATHING | GDABBS | Approved | IVRS - Inspection :* |
05/14/2009 | FRAMING | GDABBS | Approved | IVRS - Inspection :* 1) LOBBY AND EXTERIOR LOBBY OVERHANG OK |
06/08/2009 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
06/08/2009 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
06/08/2009 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
06/08/2009 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
06/08/2009 | FIRE - FINAL | LTHOMAS | Approved | |
06/24/2009 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
06/25/2009 | NPPO - FINAL | ACONNOR | Approved | |
06/25/2009 | LANDSCAPE - FINAL | ACONNOR | Approved | |
06/25/2009 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
06/25/2009 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* |
06/25/2009 | U VALUE FOR WINDOW | GDABBS | Approved | IVRS - Inspection :* |
06/25/2009 | SIGN - FINAL | JYBARRA | Approved | |
06/29/2009 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
06/29/2009 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
06/29/2009 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
06/29/2009 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
07/01/2009 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR FINAL |
07/02/2009 | ENGINEERING - FINAL | DROBERTS | Approved | BUILDING AREA IS OKAY, MINOR CHANGES THAT HAVE BEEN MADE NEED TO BE NOTED ON "AS-BUILT" GRADING PLANS. THE DRAINAGE IN BETWEEN THE EXISTING BUILDING AND THE NEW GYM ALLOWS FOR THE DEPOSITS TO BE PLACED ONTO THE ADJACENT SIDEWALKS. |
07/08/2009 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
07/08/2009 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
07/09/2009 | FIRE SPKLR - UG, PIPING, HYDRO | LLAKEY | Approved | PER INSP COPY |
07/10/2009 | RIGHT OF WAY - FINAL | MCASTRO | Approved | PER PH CALL |