Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08CM00170
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/08/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
07/07/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE LIST FROM 7/1/09 2) HAVE BACKFLOW CERT ON SITE |
|
07/01/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE FULL SIZE PIPING TO ICE MACHINE BACKFLOW DEVICE WITH CERTIFICATION. ONLY TO FINAL |
|
06/29/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BACTERIA REPORT 2) ONLY (1) SCIP JOINT CONNECTION DOWN STREAM OF P-TRAP AT TRAINING ROOM SINK 3) PROVIDE BACKFLOW PROTECTION WITH CERTIFICATION FOR ICE MACHINE 4) PROVIDE SEPERATE DRAINS FOR ICE MACHINE CONDENSATE AND ICE STORAGE BIN WITH 1" AIR GAP AT TERMINATION |
|
06/17/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CALL IN PERMIT #T08PL01223 FOR SEWER & HAVE APPROVED 2. COMPLETE ALL PLUMBING FIXTURE INSTALLS 3. PROVIDE A STERILIZATION REPORT WITH BACTERIA REPORT FOR POTABLE WATER SYSTEM 4. OPEN ALL PLUMBING ACCESS DOORS AND OPEN ALL SHOCK STOPS AND TRAP PRIMER |