Permit: T08CM00079
Permit Details
Apply Date:
01/08/2008
Applicant:
RAMMED EARTH DEVELOPMENT INC ,
Description:
SFR:RAMM MERCADO 36B R1 Add Detail 114 R2: ADD GAS BBQ 2/26/08 R3 ADD RETAINER DETAIL FOR STAIRWAY R5: ADD SOLAR PANELS
Contractors:
- RAMMED EARTH DEVELOPMENT INC ,
Permit Reviews
Permit Number - T08CM00079
Permit Status: C of o
Permit Description: SFR:RAMM MERCADO 36B
R1 Add Detail 114
R2: ADD GAS BBQ 2/26/08
R3 ADD RETAINER DETAIL FOR STAIRWAY
R5: ADD SOLAR PANELS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/08/2008 | RESIDENTIAL BLDG/ZONING-WALKTHRU | 01/09/2008 | COMPLETED |
02/07/2008 | REVISION - - 1ST | 02/07/2008 | COMPLETED |
02/26/2008 | REVISION - - 2ND | 04/10/2008 | COMPLETED |
04/10/2008 | REVISION - - 3RD | 04/10/2008 | COMPLETED |
05/12/2008 | REVISION - - 4TH | 08/06/2008 | COMPLETED |
08/06/2008 | REVISION - - 5TH | 08/06/2008 | COMPLETED |
12/16/2008 | REVISION - - 5TH | 12/17/2008 | COMPLETED |
12/29/2008 | REVISION - - 5TH | 01/02/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM00079
Permit Status: C of o
Permit Description: SFR:RAMM MERCADO 36B
R1 Add Detail 114
R2: ADD GAS BBQ 2/26/08
R3 ADD RETAINER DETAIL FOR STAIRWAY
R5: ADD SOLAR PANELS
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/08/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T08CM00079
Permit Description: SFR:RAMM MERCADO 36B
R1 Add Detail 114
R2: ADD GAS BBQ 2/26/08
R3 ADD RETAINER DETAIL FOR STAIRWAY
R5: ADD SOLAR PANELS
Total Completed Inspections - 28
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2008 | PLUMBING - SEWER HCS CONNECT | CRUIZ | Approved | IVRS - Inspection :* |
03/18/2008 | PLUMBING - ROUGH, SOIL | CRUIZ | Approved | IVRS - Inspection :* |
04/03/2008 | ELECTRIC - UNDERGROUND | CRUIZ | Approved | IVRS - Inspection :* |
04/03/2008 | ELECTRIC - UFER | CRUIZ | Approved | IVRS - Inspection :* |
04/03/2008 | BUILDING PRE-SLAB | CRUIZ | Approved | IVRS - Inspection :* |
04/03/2008 | STEM WALL/RETAINING WALL | CRUIZ | Approved | IVRS - Inspection :* |
04/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | CRUIZ | Approved | IVRS - Inspection :* |
06/04/2008 | REINFORCED MASONRY PRE-GROUT | CRUIZ | Approved | IVRS - Inspection :* |
07/22/2008 | ROOF NAILING | CRUIZ | Approved | IVRS - Inspection :* 1) DETAIL 4/SDF1 CALLS FOR BLK AND STRAPS AT ROOF OVER COURTYARD 2) NEED TO NAIL LTT20B STRAPS TO 2 X BLK 8/SD1 FIRST FLOOR 3) BEAM TO CMU WALL NOT PER DETAIL 15/SD1 4) 2ND FLOOR BEAM CONNECTION OVER PORCH NOT CONNECTED SOUTH SIDE 5) OK TO DRY IN |
07/22/2008 | EXT METAL CLIPS/EXT SHEATHING | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
08/13/2008 | MECHANICAL - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
08/13/2008 | PLUMBING - GAS PRESSURE TEST | CRUIZ | Approved | IVRS - Inspection :* |
08/13/2008 | PLUMBING - YARD WTR LINE/TEST | CRUIZ | Approved | IVRS - Inspection :* |
08/18/2008 | PLUMBING - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
08/18/2008 | ELECTRIC - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
08/19/2008 | FRAMING | CRUIZ | Approved | IVRS - Inspection :* 1) STILL WAITING ON PATIO PORCH TO BE BUILT 2) OK TO SHEETROCK HOUSE 3) VERIFIED APPROVAL ON OVERHEAD SPRINKLERS FROM FIRE MARSHALL |
09/22/2008 | SHEET ROCK NAILING | CRUIZ | Approved | IVRS - Inspection :* |
09/22/2008 | STUCCO MESH | CRUIZ | Approved | IVRS - Inspection :* |
09/29/2008 | ASSURANCE | MCARREON | Approved | |
10/03/2008 | ELECTRIC - FINAL | DQUINN | Approved | IVRS - Inspection :* 1) METER BASE OK TO BACKFILL |
10/09/2008 | ELECTRIC - TEMPORARY SERVICE | CRUIZ | Approved | IVRS - Inspection :* |
10/09/2008 | ELECTRIC - CABLE DROP | CRUIZ | Approved | IVRS - Inspection :* |
10/10/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | ECO CLEARED PER C. RUIZ |
01/27/2009 | U VALUE FOR WINDOW | CRUIZ | Approved | |
01/27/2009 | MECHANICAL - FINAL | CRUIZ | Approved | IVRS - Inspection :* |
01/27/2009 | PLUMBING - FINAL | CRUIZ | Approved | IVRS - Inspection :* |
01/27/2009 | BUILDING - FINAL | CRUIZ | Approved | IVRS - Inspection :* |
01/28/2009 | PERMIT FINALED | JWEATHER | Approved |