Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T08CM00079

Parcel: 116205640

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T08CM00079

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
03/18/2008 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
03/13/2008 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NEED TO PLUMB PER PLAN (UPC 707 & 719) OR TAKE BACK TO CITY AND CHANGE
2) FAILURE TO DO SO NEXT TIME WILL RESULT IN A REFEE
03/12/2008 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) DRAWINGS CALL FOR 2 WAY CLEANOUT
2) NEED ANTI-SIPHON ON HOSE BIB, ONCE HEATER LINE IS IN SERVICE
3) INSPECTED 2" (3/4") CONDUIT FOR 200 AMP SUB PANEL OK