Permit: T08BU00996
Permit Details
Apply Date:
05/29/2008
Applicant:
LINDA THOMPSON
Description:
GRADING: TANQUE VERDE VALLEY CASITAS
Contractors:
- K AND S II LIMITED ,
Permit Reviews
Permit Number - T08BU00996
Permit Status: Final
Permit Description: GRADING: TANQUE VERDE VALLEY CASITAS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/29/2008 | PLANS OK TO SUBMIT - GRADING | 05/29/2008 | COMPLETED |
05/29/2008 | GRADING | 07/28/2008 | COMPLETED |
07/15/2010 | REVISION - GRADING | 07/15/2010 | COMPLETED |
09/11/2008 | RESUBMITTAL - GRADING ALL | 09/30/2008 | COMPLETED |
10/03/2008 | RESUBMITTAL - GRADING ALL | 04/07/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU00996
Permit Status: Final
Permit Description: GRADING: TANQUE VERDE VALLEY CASITAS
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/29/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU00996
Permit Description: GRADING: TANQUE VERDE VALLEY CASITAS
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/21/2009 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
04/23/2009 | ENGINEERING PRE-CONSTRUCTION | JBRUCKME | Approved | OWNER AND GRADING CONTRACTOR EACH HAVE AN AZPDES AUTHORIZATION |
04/27/2009 | STORMWATER INSTALL OF CONTROLS | JBRUCKME | Approved | MAINTAIN STRAW WATTLE, BERMS AND V-DITCH TO CONTAIN ALL SEDIMENT ON SITE. UPDATE SWPPP AS NEEDED |
12/10/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | 1) MET W/ CONTRACTOR TO DISCUSS CONCERNS ALONG NORTH EDGE OF SITE. CONTRACTOR AGREED TO RE-GRADE EXISTING EASEMENT TO TIE INTO TO THE CURRENT ELEVATION AT EACH CORNER (2575) AND RAISE CONSTRUCTED WALL OPENINGS TO ALLOW STORM WATER TO SHEET FLOW ACCROSS EASEMENT FROM SOUTH TO NORTH AND ULTIMATELY BREAK TO THE WEST AND EAST OF ADJACENT PROPERTY. 2) CONTRACTOR ALSO AGREED TO IMPROVE THE ROAD TO THE EAST OF THE SITE AND BRING FINISH GRADE TO WHAT IS SHOWN ON THE APPROVED PLAN. 3) STILL AWAITING COMPACTION TESTING RESULTS FOR STORM DRAINAGE PIPING TRENCHES ALONG THE WEST SIDE OF THE SITE. 4) AWAITING REVISED PLAN SHOWING CHANGES MADE TO STORM DRAIN PIPING ALONG WEST SIDE. 5) CONTRACTOR MUST ALSO RE-ESTABLISH TEMP SEDIMENT COMTROLS TO MATCH THE APPROVED SWPPP. |
12/16/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | STORM WATER CONTROLS HAVE BEEN RE-ESTABLISHED ALONG THE EAST SIDE OF THE SITE. NO OTHER STORM WATER CONCERNS AT THIS TIME |
07/09/2010 | GRADING - CHECK FOR ACTIVITY | JFEMLING | Approved | |
07/12/2010 | LANDSCAPE INSPECTION | JFEMLING | Approved | Approved |
07/16/2010 | GRADING - TIER REV | MRUSSO | Approved | |
07/16/2010 | GRADING - FINAL | MRUSSO | Approved | |
07/21/2010 | PERMIT FINALED | KMEDINA | Approved |