Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13303300A
133032970
133032980
133033000
JurisdictionTucson
City of Tucson ZoningO-3, R-3, SR
Water Course

Washes

Tucson WardWard 2
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Historic Records Requests - (1)
Name Action
Address: 9855 E SPEEDWAY BL - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-84-32 Tanque Verde - Wrightstown 5962 6090

Rezoning Cases

Date - 11/08/2024 8:04 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-05-27 KS Companies - Speedway Boulev R-2 Withdrawn 03/13/2006

Special Development Requests & Requirements

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Special Development Permits - (3)
Activity Number Status Apply Date Expired Date Unit Type Description
T08SA00092 COMPLETE 03/10/2008 N/A Zoning Adminstration Letter Zoning compliance letter for vacant property
T21SA00427 COMPLETE 10/21/2021 N/A Zoning Adminstration Letter Zoning compliance letter for multifamily
T21SA00475 COMPLETE 11/11/2021 N/A Zoning Adminstration Letter Zoning compliance letter for multifamily

Permits

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Permits - (53)
Permit Status Apply Date Expired Date Unit Type Description
DS07-53 Approved 12/14/2007 N/A Zoning Compliance 9855 E SPEEDWAY BLVD - 9855 E. SPEEDWAY BLVD - DS 2-08.4.1.B
D07-0041 Approved 10/02/2007 N/A Development Package TANQUE VERDE VALLEY CASITAS
TS-PRM-0523-00322 Issued 05/22/2023 11/03/2024 Sign - Permanent 2 - single face internally illuminated cabinets replacing existing signs mounted on existing masonry entry wall
TF-FCP-0124-00062 Complete 01/25/2024 08/05/2024 Fire Construction Permit Replace the existing Dedicated Function Fire Panel (Firelite MS-9050) with a new Firelite ES-50X fire panel and TG-7FS Cellular communicator for sprinkler monitoring. All existing addressable devices are compatible and shall remain in place. A new pull station is to be added next to the FACP.
TC-COM-0123-00425 Needs Resubmittal 01/05/2023 07/04/2023 BLDG 1 Commercial Building Resurface swimming pool, new waterline tile, new pump(Pentair Whisperflo 2.6 VST), new sand filter(TR 100 sand filter), LED pool lights(white), Vacless(SVR System), 320 Rainbow Chlorinator, new flometer, new pressure gauge Exisiting equipment: Pentair Cartridge Filter Model 320, Pentair pump Intelliflo VS + SVRS
DS07-42 DENIED 10/03/2007 N/A DEVSTDS 9855 E SPEEDWAY BLVD - DS 6-01.0 REPLACE WALLS AND BOLLARDS WITH THE STRUCTURE SHOWN IN THE ATTACHED DETAIL.
T05BU01611 FINAL 06/24/2005 12/28/2008 DEMO DEMO:SFR
T08AN00032 ISSUED 01/10/2008 N/A ADDRNEW
T08BU00996 FINAL 05/29/2008 01/12/2011 GRADING GRADING: TANQUE VERDE VALLEY CASITAS
T08CM01825 C OF O 06/03/2008 09/22/2010 COMBO NEW: LEASING OFFICE
T08CM01826 C OF O 06/03/2008 01/18/2011 BLDG 01 COMBO NEW: APARTMENT BUILDING #1
T08CM01827 C OF O 06/03/2008 10/16/2010 BLDG 02 COMBO NEW: APARTMENT BUILDING #2
T08CM01828 C OF O 06/03/2008 06/08/2011 BLDG 03 COMBO NEW: APARTMENT BUILDING #3
T08CM01829 C OF O 06/03/2008 06/08/2011 BLDG 04 COMBO NEW: APARTMENT BUILDING #4
T08CM01830 C OF O 06/03/2008 06/08/2011 BLDG 05 COMBO NEW: APARTMENT BUILDING #5
T08CM01831 C OF O 06/03/2008 10/30/2010 BLDG 06 COMBO NEW: APARTMENT BUILDING #6
T08CM01832 C OF O 06/03/2008 12/19/2010 BLDG 07 COMBO NEW: APARTMENT BUILDING #7
T08CM01833 C OF O 06/03/2008 01/03/2011 BLDG 08 COMBO NEW: APARTMENT BUILDING #8
T08CM01834 C OF O 06/03/2008 01/03/2011 BLDG 09 COMBO NEW: APARTMENT BUILDING #9
T08CM01835 C OF O 06/03/2008 06/08/2011 BLDG 10 COMBO NEW: APARTMENT BUILDING #10
T08CM01836 C OF O 06/03/2008 06/08/2011 BLDG 11 COMBO NEW: APARTMENT BUILDING #11
T08CM01838 C OF O 06/03/2008 06/08/2011 BLDG 12 COMBO NEW: APTS BUILDING #12
T08PL01244 FINAL 08/20/2008 11/06/2010 PLUMB SITE SEWER
T09BU00833 FINAL 06/09/2009 12/28/2009 BLDG 01 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00834 FINAL 06/09/2009 12/23/2009 BLDG 02 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00835 FINAL 06/09/2009 05/08/2010 BLDG 04 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00836 FINAL 06/09/2009 02/03/2010 BLDG 06 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00837 FINAL 06/09/2009 05/08/2010 BLDG 07 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00838 CLOSED 06/09/2009 12/06/2009 BLDG 08 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00839 FINAL 06/09/2009 05/08/2010 BLDG 12 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU00840 FINAL 06/09/2009 05/08/2010 WALL/FEN FOUNDATION/RETAINING WALLS
T09BU01065 FINAL 07/21/2009 10/05/2010 SPKLR Install 10 fire sprinklers
T09BU01067 FINAL 07/21/2009 10/05/2010 BLDG 03 SPKLR Install 100 fire sprinklers
T09BU01101 FINAL 07/28/2009 10/05/2010 BLDG 01 SPKLR INSTALL:120 FIRE SPRINKLERS
T09BU01113 FINAL 07/30/2009 10/05/2010 BLDG 02 SPKLR Install 72 fire sprinklers
T09BU01332 FINAL 09/04/2009 11/10/2010 BLDG 06 SPKLR Install 73 fire sprinklers
T09BU01335 FINAL 09/04/2009 10/27/2010 BLDG 04 SPKLR Install 120 fire sprinklers
T09BU01337 FINAL 09/04/2009 10/27/2010 BLDG 05 SPKLR Install 100 fire sprinklers
T09BU01539 FINAL 10/15/2009 01/04/2011 BLDG 08 SPKLR Install 100 fire sprinklers
T09BU01540 FINAL 10/15/2009 12/12/2010 BLDG 09 SPKLR Install 100 fire sprinklers
T09BU01541 FINAL 10/15/2009 12/12/2010 BLDG 11 SPKLR Install 100 fire sprinklers
T09BU01542 FINAL 10/15/2009 11/10/2010 BLDG 12 SPKLR Install 100 fire sprinklers
T09BU01551 FINAL 10/16/2009 11/30/2010 BLDG 07 SPKLR Install 120 fire sprinklers
T09BU01803 FINAL 12/09/2009 09/28/2010 POOL/SPA POOL:SEMI PUBLIC W/90' OF 5' WROUGHT IRON FENCE & GATES
T09BU01896 FINAL 12/24/2009 12/12/2010 BLDG 10 SPKLR Install 72 fire sprinklers
T09CM01282 FINAL 05/20/2009 11/25/2009 COMBO TEMP CONSTRUCTION TRAILER
T09EX00239 CLOSED 04/21/2009 05/08/2010 EXCAV EXCA:45' WATER LINE & 45' TO INSTALL DRY UTILITIES
T10CM00062 FINAL 01/12/2010 07/27/2010 COMBO TEMP CONSTRUCTION TRAILER
T10CM00347 FINAL 02/12/2010 12/06/2010 COMBO 20 CARPORT STRUCTURES:
T10CM00348 FINAL 02/12/2010 11/09/2010 COMBO ADDITION: ONE CARPORT STRUCTURE
T10CM00683 FINAL 03/19/2010 10/18/2010 BLDG 01 COMBO PHOTOVOLTAIC SYSTEM 6.7 KW DC
T10OT00465 FINAL 03/02/2010 11/09/2010 SIGN 17988
T15CM04046 L OF C 06/16/2015 02/06/2016 COMBO (T15DV04388) DAMAGE REPAIR CAR WENT THREW BLDG

Code Enforcement

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Code Cases - (1)
Case Number Case Status Entered Date Exp Date Unit Type Description
T22DV05503 Closed - Unfounded 09/23/2022 12/06/2022 weeds inside north wall of property over grown

Plans

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
T10BA00030 Approved 09/28/2010 N/A -- Stormwater Basin
C9-05-27 WITHDRWN 03/13/2006 N/A REZONING PROCEDURES -- REZONE Proposed development for 129 one-story single- and multi-family residences on 10.02 acres for a density of 12.9 residences per acre.

Record Requests

Address: 9855 E SPEEDWAY BL
Date - 11/08/2024 8:04 p.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-1123-06148 Approved 11/08/2023 11/29/2023 Requests 2 - single face internally illuminated cabinets replacing existing signs mounted on existing masonry entry wall