Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T08BU00996
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/16/2010 | GRADING - FINAL | Approved | ||
07/09/2010 | GRADING - FINAL | Partial Approval | OK for Temp C of O complete the following prior to final; Submit as-builts to 201 Stone for review and approval. As-built elevations for east and west access roads off site every 50 ft. Add railing to access ramps as needed. |
|
06/17/2010 | GRADING - FINAL | Continued | SITE WORK STILL BEING COMPLETED. PROVIDE A COPY OF THE CERTIFIED STATEMENT FROM THE ENG OF RECORD CLARIFYING THE RETAINING WALLS CALLED OUT ON THE APPROVED GRADING PLAN. PROVIDE AN AS-BUILT DRAWING AT END OF PROJECT PRIOR TO FINAL GRADING APPROVAL. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
06/14/2010 | GRADING - FINAL | Denied | PRIOR TO FINAL GRADING APPROVAL, COMPLETE THE FOLLOWING: 1) PROVIDE AN AS-BUILT PLAN SHOWING ALL CHANGES MADE THAT ARE DIFFERENT FROM THE APPROVED GRADING PLAN (EAST RETAINING WALL DETAIL, NOTE #37 IN AREAS THAT DO NO APPLY, ATTACH DRAWING FOR NEW STORM DRAIN CONFIGURATION, ROW ACCESS CHANGE, SCUPPERS FOR ROOF DRAINS ADDED, CHANGE TO SIDEWALKS AND ACCESS AROUND BLDGS......). 2) PROVIDE A CERTIFICATION STATEMENT FROM YOUR ENGINEER OF RECORD STATING THAT THE STORM DRAINAGE SYSTEM WAS CONSTRUCTED PER THE APPROVED GRADING PLAN. 3) COMPLETE ALL CONSTRUCTION. |