Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
05/01/2008
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
CUT 7,568 CY FILL 4,175

Permit Reviews

Permit Number - T08BU00842
Permit Status: Final
Permit Description: CUT 7,568 CY FILL 4,175
Start Date Submittal Complete Date Status  
05/01/2008 PLANS OK TO SUBMIT - GRADING 05/02/2008 COMPLETED Review Details
05/05/2008 GRADING 06/05/2008 COMPLETED Review Details
06/12/2008 RESUBMITTAL - GRADING 06/20/2008 COMPLETED Review Details
06/20/2008 RESUBMITTAL - GRADING 06/25/2008 COMPLETED Review Details
06/25/2008 RESUBMITTAL - GRADING 12/24/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08BU00842
Permit Status: Final
Permit Description: CUT 7,568 CY FILL 4,175
Total Outstanding Activity Conditions - 1
Date Name
05/01/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08BU00842
Permit Description: CUT 7,568 CY FILL 4,175
Total Completed Inspections - 8
Date Description Inspector Results Comments
07/02/2008 NPPO PRE PERMIT INSPECTION ACONNOR Approved
07/17/2008 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved MET WITH SUPINTENDENT (JIM W/DIVERSIFIED). SITE IS > 1 ACRE AND HAS A SWPPP.

1) PROVIDE AS-BUILT W/ SURVEYED INVERT AND PIPE DATA AT END OF CONSTRUCTION.
2) PROVIDE AN APPROVED REVISION FOR ANY SIGNIFICANT CHANGES MADE TO THE ORIGINAL APPROVED GRADING PLAN.
3) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A CERTIFIED STATEMENT FRON THE ENGINEER OF RECORD STATING THAT ALL DRAINAGE WAYS AND RET/DET BASINS HAVE BEEN CONSTRUCTED PER THE APPROVED PLAN.
4) REDLINE APPROVED CHANGES TO THE SWPPP DRAWING AS NEEDED.
5) PERFORM ROUTINE STORM WATER SELF INSPECTIONS AND MAINTENANCE PER YOUR PLAN AND DOCUMENT THEM.
6) INSTALL AND MAINTAIN A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER PLAN.
7) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT WHEN APPLICALBLE.
8) SWEEP UP ALL TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY.
9) PROVIDE AND POST A COPY OF YOUR NOI ON SITE PER AZPDES.
08/20/2008 STORMWATER INSTALL OF CONTROLS MRUSSO Approved
12/23/2008 STORMWATER FOLLOW-UP INSP MRUSSO Approved PLACE SEDIMENT CONTROLS AROUND EXISTING STOCKPILE AND/OR REMOVE MATERIAL FROM SITE AS SOON AS PRACTICABLE.
CITY OF TUCSON DEV. STDS CALL FOR STOCKPILES THAT ARE >8' TO BE BENCHED AND EROSION/SEDIMENT CONTROLS INSTALLED.
07/10/2009 GRADING - INTERMEDIATE DROBERTS Approved
07/16/2009 LANDSCAPE INSPECTION DROBERTS Approved
07/16/2009 GRADING - FINAL DROBERTS Approved WENT TO THE SITE AND SIGNED OFF ALL OF THE REMAINING ITEMS ON THE INSPECTION CARDS FOR THIS SITE AND CLOSED OUT THE CURRENT GRADING PERMIT.
07/20/2009 GRADING - CHECK FOR ACTIVITY MRUSSO Approved

Documents

File Name Document Type  
DRAINAGERPT.TIF DOCUMENTS VIEW
GEOTECHEVAL.TIF DOCUMENTS VIEW
STORMWATERPPP_01.TIF DOCUMENTS VIEW
STORMWATERPPP_02.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW
001__1.TIF DOCUMENTS VIEW
002__1.TIF DOCUMENTS VIEW
003__1 OF 2.TIF DOCUMENTS VIEW
004__2 OF 2.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW
C.1.TIF GRADING PLANS VIEW
C.2.TIF GRADING PLANS VIEW
C.3.TIF GRADING PLANS VIEW
C.4.TIF GRADING PLANS VIEW