Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T08BU00842
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2009 | GRADING - INTERMEDIATE | Approved | ||
04/20/2009 | GRADING - INTERMEDIATE | Continued | SUBGRADE BEING SET FOR PAVING ALONG WEST SIDE OF BLDG. WEST ENTRANCE/DROP OFF AREA COMPLETED PER PLAN. PROVIDE AN APPROVED, REVISED PLAN SHOWING ANY AND ALL CHANGES MADE. |
|
04/02/2009 | GRADING - INTERMEDIATE | Continued | SOME CURBING BEING INSTALLED, STILL NO PAVEMENT. NEED REVISED PLAN FOR CHANGES MADE TO NW BASIN PIPING, AND ANY ADDITIONAL CHANGES MADE FROM THE ORIGINAL APPROVED GRADING PLAN. |
|
03/16/2009 | GRADING - INTERMEDIATE | Continued | SITE WORK HAS NOT BEEN COMPLETED, NO SIGNIFICANT CHANGES FROM LAST INSPECTION. | |
02/27/2009 | GRADING - INTERMEDIATE | Continued | 1) STORM DRAIN ALONG NW SIDE OF SITE CHANGED FROM 18"T0 12", AND NOT INSTALL CLEAN-OUT AT 45 DEGREE ELBOW. NEED REVISION ON PLANS SHOWING CHANGES MADE. 2) ROOF DRAINS ON EAST SIDE OK. 3) WEST SIDE ROOF DRAINS - ONE SECTION OF PIPE (SOUTH LEG) IS FLAT , AND WEST SIDE AT NORTH END NEEDS RE-GRADED IN ORDER TO FLOW SOUTH INTO THE NEW RET/DET BASIN. 4) CONCRETE RAMPS POURED AT THIS TIME OK FOR SLOPE. |
|
02/03/2009 | GRADING - INTERMEDIATE | Correction Required | 1) ROOF DRAINS ALONG THE EAST AND WEST SIDE OF THE BLDG ARE NO SHOWN ON THE APPROVED GRADING PLAN - NEED TO SHOW HOW AND WHERE STORM WATER IS ROUTED. 2) CHANGE IN SIZE AND LOCATION OF CMP TO BE INSTALLED ALONG THE NE SIDE OF SITE NEAR RETAINING WALL - NEED REVISED PLAN. 3) MAY NEED SAFETY RAILING ALONG RET/DET BASIN ON SOUTH SIDE OF BLDG. - STD CALLS FOR BASIN W/ SLOPE 3:1 OR GREATER AND A BASIN DEEPER THAN TWO FEET NEEDS A RAILING. 4) PROVIDE A DRAINAGE/RET/DET BASIN CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING CONFORMANCE WITH THE APPROVED GRADING PLAN. |