Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU00842
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
03/16/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
02/27/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
02/03/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | SEDIMENT CONTROLS MUST REMAIN IN PLACE AND CONTINUE TO BE MAINTAINED UNTIL THE SITE IS 100% STABILIZED. CONTIUE TO SWEEP UP TRACKING OF SOIL OFF OF PUBLIC ROADWAYS. |
|
12/23/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PLACE SEDIMENT CONTROLS AROUND EXISTING STOCKPILE AND/OR REMOVE MATERIAL FROM SITE AS SOON AS PRACTICABLE. CITY OF TUCSON DEV. STDS CALL FOR STOCKPILES THAT ARE >8' TO BE BENCHED AND EROSION/SEDIMENT CONTROLS INSTALLED. |
|
11/06/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
09/09/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SWEEP UP TRACKING FROM PUBLIC ROADWAY. 2) CLEAN OUT CONCRETE/MATERIALS WASH-OUT. 3) CONTINUE TO PERFORM STORM WATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM. |
|
08/20/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH CONSTRUCTION ENTRANCES/EXITS AS NEEDED. 2) CONTINUE TO SWEEP UP TRACKED AMTERIAL OFF OF PUBLIC ROADWAYS AND PARKING AREAS. 3) REMOVE STOCKPILED MATERIAL AWAY FROM DRAINAGE ALONG NW CORNER OF SITE OR INSTALL SUPPLEMENTAL CONTROLS AROUND IT. |
|
08/20/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | A PERIMETER BIRM WAS INSTALLED AT LOT ACCROSS STREET TO NORTH OF PROJECT TO REDUCE EROSION DAMAGE FROM SW RUN-OFF. SILT FENCE WAS INSTALL AT TOE OF SLOPE AT NORTH LOT. MAY NEED TO RE-ESTABLISH SILT FENCE PRIOR TO PROJECT COMPLETION. MAY NEED TO LOOK AT HC ACCESS TO RESTURANT FROM RIGHT-OF-WAY. |