Permit: T08BU00699
Permit Details
Apply Date:
04/10/2008
Applicant:
JOHN LUPO
Description:
GRADING: DESERT CHRISTIAN SCHOOL - 8400 CY CUT 10100 FILL
Contractors:
- EASTERN STYLE BUILDERS INC ,
Permit Reviews
Permit Number - T08BU00699
Permit Status: Final
Permit Description: GRADING: DESERT CHRISTIAN SCHOOL - 8400 CY CUT 10100 FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/03/2012 | REVISION - GRADING | 01/19/2012 | COMPLETED |
03/24/2009 | RESUBMITTAL - GRADING ALL | 04/14/2009 | COMPLETED |
04/10/2008 | PLANS OK TO SUBMIT - GRADING | 04/30/2008 | COMPLETED |
04/30/2008 | GRADING | 06/23/2008 | COMPLETED |
05/01/2009 | RESUBMITTAL - GRADING | 04/27/2010 | COMPLETED |
05/03/2012 | REVISION - GRADING | 05/09/2012 | COMPLETED |
09/19/2011 | REVISION - GRADING | 09/19/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU00699
Permit Status: Final
Permit Description: GRADING: DESERT CHRISTIAN SCHOOL - 8400 CY CUT 10100 FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/10/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU00699
Permit Description: GRADING: DESERT CHRISTIAN SCHOOL - 8400 CY CUT 10100 FILL
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | MET W/ SITE SUPERINTENDENT AND SITE FORMAN TO DISCUSS STORM WATER REQUIREMENTS, AND ALL SITE WORK INVOLVED WITH THIS PROJECT. 1) PROVIDE AN APPROVED COPY OF YOUR SWPPP ON SITEW/ A SIGNED COPY OF YOUR NOI. 2) PROVIDE AN APPROVED COPY OF YOUR GRADING PLAN ON SITE FOR INSPECTION. 3) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN AND THE DISCUSSION MADE AT THE PRECON. 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE IN SITE. 5) SWEPP UP ALL TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ON A ROUTINE BASIS. 6) PERFORM PERIODIC STORM WATER MAINTENANCE SELF INSPECTION PER YOUR APPROVED SWPPP. 7) INSTALL A CONCRETE WASH - OUT ON SITE WHEN APPLICABLE. 8) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE CONSTRUCTION. CALL FOR REINSPECTION FOR ANY QUESTIONS AND/OR CONCERNS. |
07/28/2010 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | |
11/15/2010 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | FOLLOW-UP INSPECTION; STORM DRAIN PIPING HAS BEEN INSTALLED AND COVERED. CONTRACTOR INSTALLED TWO CATCH BASINS AND TWO MANHOLES. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
11/15/2010 | GRADING - INTERMEDIATE | MRUSSO | Approved | FOLLOW-UP INSPECTION; STORM DRAIN PIPING HAS BEEN INSTALLED AND COVERED. CONTRACTOR INSTALLED TWO CATCH BASINS AND TWO MANHOLES. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
09/12/2011 | LANDSCAPE INSPECTION | MRUSSO | Approved | |
09/12/2011 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
09/20/2011 | GRADING - FINAL | MRUSSO | Approved |