Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T08BU00699
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | MET W/ SITE SUPERINTENDENT AND SITE FORMAN TO DISCUSS STORM WATER REQUIREMENTS, AND ALL SITE WORK INVOLVED WITH THIS PROJECT. 1) PROVIDE AN APPROVED COPY OF YOUR SWPPP ON SITEW/ A SIGNED COPY OF YOUR NOI. 2) PROVIDE AN APPROVED COPY OF YOUR GRADING PLAN ON SITE FOR INSPECTION. 3) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN AND THE DISCUSSION MADE AT THE PRECON. 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE IN SITE. 5) SWEPP UP ALL TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ON A ROUTINE BASIS. 6) PERFORM PERIODIC STORM WATER MAINTENANCE SELF INSPECTION PER YOUR APPROVED SWPPP. 7) INSTALL A CONCRETE WASH - OUT ON SITE WHEN APPLICABLE. 8) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE CONSTRUCTION. CALL FOR REINSPECTION FOR ANY QUESTIONS AND/OR CONCERNS. |
|
07/26/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | SPOKE WITH SITE FORMAN ON DEMO WORK BEING DONE ON SITE. HE ALSO STATED THAT CONSTRUCTION WILL START SOON AND A PRE-CON INSPECTION WILL BE CALLED IN. | |
06/03/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | RIGHT OF WAY WORK BEING DONE, UTILITY TIE-IN WORK. CONTRACTOR NEEDS TO CALL IN A PRECON MEETING PRIOR TO GRUBBING AND GRADING ON SITE. |