Permit: T08BU00699

Parcel: 133040030

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T08BU00699

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
09/12/2011 GRADING - INTERMEDIATE Approved
07/22/2011 GRADING - INTERMEDIATE Continued 1) MET WITH SUPERINTENDENT TO DISCUSS FINAL GRADING APPROVAL AND STATE APPROVAL FOR OCCUPANCY OF CONSTRUCTED BLDGS.
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
3)ENSURE ALL AREAS ARE STABILIZED ND SITE WORK IS COMPLETED PRIOR TO FINAL APPROVAL.
4) PROVIDE A CERTIFICATION STATEMENT FROM YOUR ENGINEER OF RECORD.
06/07/2011 GRADING - INTERMEDIATE Continued MET W/ SUPERINTENDENT TO DETERMINE WHAT IS NEEDED FOR ENG/LANDSCAPE/NPPO APPROVAL OF THE ADMIN BLDG OF THE SCHOOL. HOWEVER, ENG, LANDSCAPE, AND NPPO INSPECTIONS ARE NOT ON THE BLDG PERMIT, THEREFORE APPROVAL IS NOT REQUIRED FOR A BLDG RELEASE.

MOST SITE WORK HAS BEEN COMPLETED AND MOST LANDSCAPING IS IN. NO STORM WATER CONNCERNS AT THIS TIME.

A CERTIFICATION STATEMENT FROM THE ENG OF RECORD IS REQUIRED PRIOR TO FINAL GRADING APPROVAL.
ENSURE ALL SITE CONSTRUCTION IS COMPLETED PRIOR TO FINAL
02/16/2011 GRADING - INTERMEDIATE Continued PRIOR TO APPROVAL BY ENGINEERING FOR A C OF O, THE CONTRACTOR MUST COMPLETE ALL SITE WORK ASSOCIATED WITH THE BUILDING THATS REQUESTING OCCUPANCY.

ALL PARKING, ACCESS, LANDSCAPING AND STORM WATER DRAINAGE ASSOCIATED WITH THE BUILDING MUST BE COMPLETED.

CONTRACTOR MUST SEPARATE REMAINING CONSTRUCTION FROM THE PUBLIC.

THE LAST BUILDING ON THE SITE WILL NOT BE APPROVED UNTIL THE GRADING PERMIT (T08BU00699) IS SATISFIED AND APPROVED.

NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/15/2010 GRADING - INTERMEDIATE Continued FOLLOW-UP INSPECTION; STORM DRAIN PIPING HAS BEEN INSTALLED AND COVERED. CONTRACTOR INSTALLED TWO CATCH BASINS AND TWO MANHOLES. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/08/2010 GRADING - INTERMEDIATE Continued 1) INSPECTED INSTALLATION OF 18" HDPE STORM DRAIN PIPE SHOWN ON APPROVED GRADING PLAN.
2) PIPE TRENCH WAS COMPACTED AND BEDDED, PIPE WAS SHADED W/ CLEAN SOIL TO THE SPRING LINE.
3) PIPE HAS POSITIVE DRAINAGE THROUGHOUT, OK TO COVER. PIPE MANUFACTURER INSTRUCTION WERE USED FOR INSTALL - NO DETAIL ON APPROVED GRADING PLAN.
4) SUBCONTRACTOR POURING CONCRETE FOR MANHOLES AND CATCH BASINS USING COT STD DETAILS 300/308.
5) WILL INSPECT FINISHED CATCH BASINS AND MANHOLES NEXT WEEK.
6) WEST DRAINAGE CHANNEL AND NORTH CHANNEL HAVE BEEN ROUGHED IN.
7) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
10/19/2010 GRADING - INTERMEDIATE Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.

SOME ROUGH SITE WORK BEING DONE, BUT SITE IS MOSTLY STILL BEING GRADED (DIRT WORK).
09/07/2010 GRADING - INTERMEDIATE Continued SEDIMENT CONTROLS IN PLACE AND HAVE BEEN MAINTAINED. NO TRACKING OF SOIL OFF SITE. CONTRACTORS ARE OVER-EXCAVATING FOR BLDG PADS. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.