Permit: T08BU00196
Permit Details
Apply Date:
01/31/2008
Applicant:
N/A
Description:
CUT 1259CY FILL 6343CY
Contractors:
- RIO WEST DEVELOPMENT AND CONSTRU
Permit Reviews
Permit Number - T08BU00196
Permit Status: Final
Permit Description: CUT 1259CY FILL 6343CY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2009 | REVISION - GRADING | 01/26/2009 | COMPLETED |
01/26/2009 | REVISION - GRADING | 02/17/2009 | COMPLETED |
01/31/2008 | PLANS OK TO SUBMIT - GRADING | 02/05/2008 | COMPLETED |
02/05/2008 | GRADING | 04/02/2008 | COMPLETED |
04/04/2008 | RESUBMITTAL - GRADING ALL | 04/07/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU00196
Permit Status: Final
Permit Description: CUT 1259CY FILL 6343CY
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/31/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU00196
Permit Description: CUT 1259CY FILL 6343CY
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/27/2008 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Completed pre-con with Shawn (250-2364) project manager Rio West |
06/19/2008 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Contractor install controls. |
11/05/2008 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | Contractor needs to install all controls on north side of project. |
11/12/2008 | GRADING - FINAL | MAVERY | Approved | Prelim. punch list. Contractor needs to: 1- Complete all drainage per approved drawings. 2- Stabilize all areas disturbed by construction, on and off site. 3- Engineer needs to address wall opening for block wall eastside of Property. |
11/12/2008 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
12/08/2008 | GRADING - INTERMEDIATE | MAVERY | Approved | Contractor cut swall, no other work completed. |
12/01/2009 | GRADING - CHECK FOR ACTIVITY | MCARREON | Approved | SPOKE WITH CONTRACTOR AND SCHEDULED A 10:00 INSPECTION TIME TO MEET ON SITE. WHEN I WAS ON MY WAY TO SITE RECEIVED A PHONE CALL FROM CONTRACTOR CANCELLING INSPECTION DUE TO UNFINISHED ITEMS. SHAWN FROM RIO WEST (250-2364) WILL RESCHEDULE WHEN READY. |