Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
3682 S WALL ST
Apply Date:
01/31/2008
Applicant:
N/A
Description:
CUT 1259CY FILL 6343CY
Contractors:
  • RIO WEST DEVELOPMENT AND CONSTRU

Permit Reviews

Permit Number - T08BU00196
Permit Status: Final
Permit Description: CUT 1259CY FILL 6343CY
Start Date Submittal Complete Date Status  
01/26/2009 REVISION - GRADING 01/26/2009 COMPLETED Review Details
01/26/2009 REVISION - GRADING 02/17/2009 COMPLETED Review Details
01/31/2008 PLANS OK TO SUBMIT - GRADING 02/05/2008 COMPLETED Review Details
02/05/2008 GRADING 04/02/2008 COMPLETED Review Details
04/04/2008 RESUBMITTAL - GRADING ALL 04/07/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08BU00196
Permit Status: Final
Permit Description: CUT 1259CY FILL 6343CY
Total Outstanding Activity Conditions - 1
Date Name
01/31/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08BU00196
Permit Description: CUT 1259CY FILL 6343CY
Total Completed Inspections - 7
Date Description Inspector Results Comments
05/27/2008 ENGINEERING PRE-CONSTRUCTION MAVERY Approved Completed pre-con with Shawn (250-2364) project manager Rio West
06/19/2008 STORMWATER INSTALL OF CONTROLS MAVERY Approved Contractor install controls.
11/05/2008 STORMWATER FOLLOW-UP INSP MAVERY Approved Contractor needs to install all controls on north side of project.
11/12/2008 GRADING - FINAL MAVERY Approved Prelim. punch list. Contractor needs to:
1- Complete all drainage per approved drawings.
2- Stabilize all areas disturbed by construction, on and off site.
3- Engineer needs to address wall opening for block wall eastside of Property.
11/12/2008 LANDSCAPE INSPECTION ACONNOR Approved
12/08/2008 GRADING - INTERMEDIATE MAVERY Approved Contractor cut swall, no other work completed.
12/01/2009 GRADING - CHECK FOR ACTIVITY MCARREON Approved SPOKE WITH CONTRACTOR AND SCHEDULED A 10:00 INSPECTION TIME TO MEET ON SITE. WHEN I WAS ON MY WAY TO SITE RECEIVED A PHONE CALL FROM CONTRACTOR CANCELLING INSPECTION DUE TO UNFINISHED ITEMS. SHAWN FROM RIO WEST (250-2364) WILL RESCHEDULE WHEN READY.

Documents

File Name Document Type  
C1.0.TIF GRADING PLANS VIEW
C1.1.TIF GRADING PLANS VIEW
C1.2.TIF GRADING PLANS VIEW
C1.3.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
BOND RELEASE LETTER 2012_06_27.PDF DOCUMENTS VIEW