Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU00196
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/03/2011 | STORMWATER FOLLOW-UP INSP | Approved | ||
11/02/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | CONCERNS AT THIS TIME ARE MOSTLY CENTERED AROUND ALL OF THE RETENTION/DETENTION BASINS AND DRAINAGE WAYS LOCATED WITHIN THE BOUNDARIES OF THIS SITE. THEY HAVE OVER GROWN PLANTS, TREES, AND TRASH THAT NEED TO BE REMOVED AS NOTED DURING THE PREVIOUS ENGINEERING INSPECTION FOR T07CM04648 PERFORMED BY JIM FEMLING. | |
10/13/2010 | STORMWATER FOLLOW-UP INSP | Correction Required | site not completly stabilized, need to finish work | |
11/05/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install all controls on north side of project. | |
09/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install SWPPP controls on north west side. | |
06/26/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Controls in place |