Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 06/19/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
Contractor install controls. |
| 06/02/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
Controls still not installed. |
| 05/27/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
Contractor has not completed SWPPP controls. |
| 05/22/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
Controls still not complete. |
| 05/21/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
Contractor started installing controls (SWPPP) still not complete. Shawn said they ran out of stakes. |
| 05/20/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
Contractor grading with no controls installed. If controls (SWPPP) are not install will issue a stop work order. |