Permit: T08BU00196

Parcel: 132130250


Addresses:

3682 S WALL ST


Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T08BU00196

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/11/2012 GRADING - FINAL Approved PER FINAL ENG. APPROVAL ON T07CM04648
11/03/2011 GRADING - FINAL Correction Required SPOKE TO MR. HOGUE FROM RIO WEST DEVELOPMENT THIS MORNING ABOUT THE SITE. HE WAS ADVISED THAT THIS SITE NEEDS TO BE COMPLETED, INSPECTED AND APPROVED SO THAT ALL OF THE OPEN PERMITS CAN BE CLOSED. THESE NOT BEING CLOSED WILL HOLD ANY ADDITIONAL PERMITS TILL ALL OUTSTANDING ISSUES ARE ADDRESSED. ON THIS PERMIT WE WILL BE HOLDING THE FOLLOWING TWO INSPECTIONS OPEN TO ENSURE THAT ALL OF THE WORK IS COMPLETED. THESE TWO INSPECTIONS WILL BE 9180 LANDSCAPING FINAL, AND 9190 FINAL GRADING, ALL OTHERS CAN BE CLOSED AT THIS TIME.
11/02/2011 GRADING - FINAL Correction Required COMPLETE THE SITE WORK AS SHOWN ON ALL OF THE APPROVED PLANS AND RESCHEDULE ALL FINAL INSPECTIONS FOR BOTH THE GRADING PERMIT AND THE BUILDING PERMIT. PROVIDE AS-BUILT DRAWINGS FOR ALL CHANGES THAT ARE NOT REFLECTED ON APPROVED DRAWINGS AT THIS TIME, A STAMPED CERTIFICATION LETTER FOR THE SITE FROM THE ENGINEER OF RECORD STATING THAT THE SITE HAS BEEN CONSTRUCTED PER THE APPROVED DRAWINGS. ENSURE THAT ALL DAMAGED ITEMS HAVE BEEN REPAIRED PRIOR TO SCHEDULING ALL FINAL INSPECTIONS TO PREVENT ADDITIONAL INSPECTIONS TO BE COMPLETED AT A LATER DATE.
03/21/2011 GRADING - FINAL Continued SIGLER OPEN FOR BUSINESS . NO ONE WORKING OUT SIDE OF BUILDING.
10/13/2010 GRADING - FINAL Correction Required Met with contractor in August about finishing project needs to stabilize site and clean vegetation from basin and drainage swales
07/19/2010 GRADING - FINAL Denied SPOKE WITH SHAUN DONALDSON (250-2364) OF RIO WEST TO ADDRESS STATUS OF PROJECT. SHAUN HAD CALLED A FINAL INSPECTION IN ON 12/1/09 AND THEN CANCELLED THE MORNING OF INDICATING HE HAD A FEW MORE ITEMS TO ADDRESS. HE NEVER CALLED IN FOR A RE-INSPECTION. ACCORDING TO SHAUN, HE SHOULD BE PREPARED TO FINALIZE THE PROJECT WITHIN THE NEXT 2 WEEKS. HE WILL CALL IN AN INSPECTION.
11/12/2008 GRADING - FINAL Denied Prelim. punch list. Contractor needs to:
1- Complete all drainage per approved drawings.
2- Stabilize all areas disturbed by construction, on and off site.
3- Engineer needs to address wall opening for block wall eastside of Property.
11/04/2008 GRADING - FINAL Correction Required Contractor needs to:
1- Install SWPPP controls northwest corner, per design.
2- Install drainage next to trash enclosure per approved drawings.
3- Address ponding on asphalt that last longer then 24 hours.
4- East side wall not shown on approved drawings. Engineer needs to address wall opening.
10/31/2008 GRADING - FINAL Correction Required Issued Correction Notice. Contractor needs to:
1- Clean all track out on Wall St. and Ajo.
2- Engineer needs to address wall openings Northeast corner of project.
3- Address flow westside of trash enclosure.
Spoke to site super in regards to. Contractor has 3 days to address, if not addressed will issued Notice of Violation or Stop Work Order.
10/21/2008 GRADING - FINAL Partial Approval Met with Phil on site to look at HC ramps. Contractor needs to maintain 8.33% on ramp with a 2% cross slope and 5% slope on walkways. No ponding and drainage across HC ramps. Items have not been placed in concrete at this time.
05/27/2008 GRADING - FINAL Correction Required Issued Correction Notice. Contractor needs to:
1- Clean all track out from site.
2- Complete SWPPP installation. (all)
3- Provide NOI with AZ-CON number.
Contractor has 2 days to address items, if items are not addressed I will issue a Stop Work Order. Spoke to Shawn Project Manager for Rio West.