Permit: T07CM04107
Permit Details
Apply Date:
10/18/2007
Applicant:
PODOLSKY, WILLIAM I
Description:
TI: WHOLESALES FLOORING
Architects:
- PODOLSKY, WILLIAM I
Contractors:
- RUNNELS COMPANY L L C
Permit Reviews
Permit Number - T07CM04107
Permit Status: C of o
Permit Description: TI: WHOLESALES FLOORING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2008 | POST 3RD PARTY REVIEW | 02/19/2008 | COMPLETED |
| 10/18/2007 | PLANS OK TO SUBMIT - COMM | 10/18/2007 | COMPLETED |
| 10/18/2007 | 3RD PARTY REVIEW-COMMERCIAL TI | 01/22/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM04107
Permit Status: C of o
Permit Description: TI: WHOLESALES FLOORING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/18/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM04107
Permit Description: TI: WHOLESALES FLOORING
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2007 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* 1. BLAKE TEE IS LISTED AS A VERTICAL SURFACE WALL CLEANOUT. USE A DIRECTED FITTING 2. IS-5 2006 UPC - NO FEMALE ABS THREAD IN AN ACCESSIBLE LOCATION 3. N/H BAND LISTED FOR CAST IRON USE APPROVED MISSION COUPLING. REINSPECTED 2:20 PM CORRECTIONS MADE OK OK TO COVER UNDERGROUND DON'T FORGET TO WRAP PRE-POUR |
| 11/20/2007 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* |
| 12/17/2007 | ELECTRIC - INTERMEDIATE | CCLEMENS | Approved | IVRS - Inspection :* OK WALL COVER OK HARD LIDS BATHROOMS DOES NOT INCLUDE PANELS "A" & "AA" WALL |
| 12/18/2007 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
| 12/31/2007 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1. NOT INSTALLED PER PLAN. NO REDLINES ON SITE. 2. TRAP ARMS MAY NOT CHANGE SIZE - TRAP AND TRAP ARM TO BE THE SAME SIZE - TRAP MAY BE ONLY ONE SIZE LARGER THAN THE TAILPIECE TO WHICH IT IS CONNECTED. 3. CAP OFF ALL OPEN SEWER PIPES ASAP 4. SUPPORT ALL STUB OUTS USE APPROVED SUPPORTS SEE PLAN NOTE NUMBER 6 PLAN CALLS FOR TYPE "L" COPPER FLANGE TO BE APPROVED TYPE INSPECTION STOPPED - CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE. |
| 12/31/2007 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 02/26/2008 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
| 03/12/2008 | U VALUE FOR WINDOW | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/12/2008 | ELECTRIC - FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
| 03/12/2008 | ELECTRIC - ABOVE CEILING | CCLEMENS | Approved | IVRS - Inspection :* |
| 03/12/2008 | FIRE - FINAL | LTHOMAS | Approved | |
| 03/13/2008 | SIGN - FINAL | JYBARRA | Approved | PER SIGN PERMIT |
| 03/17/2008 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
| 03/17/2008 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 03/24/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 03/25/2008 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* OK C OF O |
| 03/25/2008 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 03/25/2008 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 05/21/2008 | ENGINEERING - FINAL | MRUSSO | Approved | |
| 05/21/2008 | RIGHT OF WAY - FINAL | DLEE | Approved | BY PHONE |