Permit: T07CM03300
Permit Details
Apply Date:
08/08/2007
Applicant:
GARY STRIYLE
Description:
TI: REMODEL LEASING OFFICE
Architects:
- SHINGLETON, GERALD LEE
Contractors:
- MULTIFAMILY SERVICES BUILDING INC
- PRAXIS CONSTRUCTION GROUP L L* C
Permit Reviews
Permit Number - T07CM03300
Permit Status: C of o
Permit Description: TI: REMODEL LEASING OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2010 | REVISION - - 1ST | 04/22/2010 | COMPLETED |
| 08/08/2007 | COMMERCIAL TI | 08/09/2007 | COMPLETED |
| 08/09/2007 | OTHER | 08/09/2007 | COMPLETED |
| 08/09/2007 | OTHER | 08/10/2007 | COMPLETED |
| 08/11/2007 | OTHER | 03/04/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM03300
Permit Status: C of o
Permit Description: TI: REMODEL LEASING OFFICE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/08/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM03300
Permit Description: TI: REMODEL LEASING OFFICE
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2007 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
| 09/27/2007 | FRAMING | JBURGE | Approved | IVRS - Inspection :* CALL WHEN RESTROOM CHANGES ARE COMPLETED ON THE APPROVED PLANS |
| 09/27/2007 | NPPO - FINAL | ACONNOR | Approved | N/A |
| 09/27/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | N/A |
| 10/02/2007 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* OK WALLS |
| 10/03/2007 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO SHEETROCK & TAPE ONE SIDE |
| 10/18/2007 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* NEED ELECTRIC FINAL |
| 10/18/2007 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
| 10/18/2007 | ENGINEERING - FINAL | JBRUCKME | Approved | |
| 10/18/2007 | FIRE - FINAL | LTHOMAS | Approved | |
| 10/29/2007 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. BOXES MORE THAN 1/4" FROM BOX TO SURFACE - 314.20 2. A MANUFACTURES HOLD IS NEEDED FOR BACK FED BREAKER - 408.16 3. CANNOT TRIM CONDUCTORS 4. FINISH #6 OF PREVIOUS INSPECTION - MAIN IS NOT 100 AMP AS PER PLANS. |
| 03/26/2010 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 03/26/2010 | MECHANICAL - FINAL | JBURGE | Approved | IVRS - Inspection :* |
| 03/26/2010 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
| 03/26/2010 | BUILDING - PROGRESS | JBURGE | Approved | IVRS - Inspection :* |
| 03/26/2010 | RIGHT OF WAY - FINAL | PWhiddon | Approved | |
| 05/20/2010 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* |
| 06/02/2010 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* |
| 06/03/2010 | PLUMBING - PRE SLAB | BBENEDON | Approved | IVRS - Inspection :* |