Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07CM03300
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/19/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
05/14/2010 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
10/29/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. BOXES MORE THAN 1/4" FROM BOX TO SURFACE - 314.20 2. A MANUFACTURES HOLD IS NEEDED FOR BACK FED BREAKER - 408.16 3. CANNOT TRIM CONDUCTORS 4. FINISH #6 OF PREVIOUS INSPECTION - MAIN IS NOT 100 AMP AS PER PLANS. |
|
10/18/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NO POWER TO RECEPTACLES IN OFFICE 2. CONNECT EQUIPMENT GROUNDING CONDUCTOR TO SWITCHES. 3. EM/NL NOT PER PLAN 4. INSTALL BREAKERS LISTED FOR USE IN PANEL 5. PROVIDE DETAILED PANEL SCHEDULE 6. SEE SERIES RATING NOTE ON SHEET E-3 REQUIRES MAIN BREAKER TO BE REPLACED WITH 22K A/C RATING & ALL DOWNSTREAM BREAKERS TO BE 10 K A/C |