Status:
Final
Type:
COMMERCIAL NEW
Address NEW:
1660 W VALENCIA RD
Apply Date:
06/13/2007
Applicant:
SBBL ARCHITECTURE + PLANNING
Description:
SHELL BLDG:NEW 1 BLDG
Architects:
  • SBBL ARCHITECTURE + PLANNING
Contractors:
  • DIVERSIFIED DESIGN AND CONSTRUCT

Permit Reviews

Permit Number - T07CM02468
Permit Status: Final
Permit Description: SHELL BLDG:NEW 1 BLDG
Start Date Submittal Complete Date Status  
02/14/2008 3RD PARTY REVIEW-REVISION/OTHER 02/15/2008 COMPLETED Review Details
06/13/2007 PLANS OK TO SUBMIT - 3RD PARTY 06/19/2007 COMPLETED Review Details
06/19/2007 3RD PARTY REVIEW-COMMERCIAL 09/27/2007 COMPLETED Review Details
09/27/2007 POST 3RD PARTY REVIEW 10/03/2007 COMPLETED Review Details
10/03/2007 REVISION - - 1ST 10/22/2007 COMPLETED Review Details
11/16/2007 3RD PARTY REVIEW-REVISION/OTHER 11/16/2007 COMPLETED Review Details
11/16/2007 3RD PARTY REVIEW-REVISION/OTHER 11/16/2007 COMPLETED Review Details
11/28/2007 3RD PARTY REVIEW-REVISION/OTHER 11/28/2007 COMPLETED Review Details
12/12/2007 3RD PARTY REVIEW-REVISION/OTHER 12/12/2007 COMPLETED Review Details
12/14/2007 3RD PARTY REVIEW-REVISION/OTHER 12/14/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM02468
Permit Status: Final
Permit Description: SHELL BLDG:NEW 1 BLDG
Total Outstanding Activity Conditions - 1
Date Name
06/13/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T07CM02468
Permit Description: SHELL BLDG:NEW 1 BLDG
Total Completed Inspections - 44
Date Description Inspector Results Comments
10/12/2007 SITE - SEWER RLEDONNE Approved IVRS - Inspection :*
10/16/2007 STEM WALL/RETAINING WALL LHANLY Approved IVRS - Inspection :*
10/29/2007 ELECTRIC - UFER DSANTACR Approved IVRS - Inspection :*
11/09/2007 PLUMBING - ROUGH, SOIL RLEDONNE Approved IVRS - Inspection :*
SHELL SPACE ROUGH SOIL
TWO WAY CLEANOUT OUTSIDE OF BUILDING
5' INSIDE OF BUILDING TEST OK
11/15/2007 PLUMBING - ROOF DRAINS RLEDONNE Approved IVRS - Inspection :*
1. ROOF DRAIN & OVERFLOW PIPING OUT OF BUILDING AND 10' UP INSIDE BUILDING. TEST OK
2. VENT FOR GREASE INTERCEPTOR FOR SHELL
SPACE #600, #700, #800
11/19/2007 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
1) OK WALL 2"A" THRU 2"D" WALL WITH STUB UPS OK
2) OK UFERS 2"A" THRU 2"D"
11/19/2007 PLUMBING - YARD WTR LINE/TEST RLEDONNE Approved IVRS - Inspection :*
1) SHELL SPACE #100 YARD WATER STUB IN BLDG AND OUT 5' TEST OK
12/07/2007 REINFORCED MASONRY PRE-GROUT LHANLY Approved IVRS - Inspection :*
12/14/2007 FRAMING LHANLY Approved IVRS - Inspection :*
OK TO SHEATH FACADE @ OFFICE DEPOT & MELROSE
12/17/2007 BUILDING PRE-SLAB MHENSON Approved IVRS - Inspection :*
D-J 3-5 PARTIAL OK TO POUR
12/19/2007 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :*
CROSSOVER @ LOAD DECK AREA 10-11 OK
12/28/2007 ROOF NAILING MHENSON Approved IVRS - Inspection :*
GRIDLINE 1-3 OK TO BUILD CRICKETS
02/07/2008 PLUMBING - PRE SLAB RLEDONNE Approved IVRS - Inspection :*
04/03/2008 PLUMBING - GAS PRESSURE TEST RLEDONNE Approved IVRS - Inspection :*
1. 2A, 2B, 2C, 2D PER RED DRAWING TEST OK
FROM METER TO VALVES AT UNITS, FROM VALVES TO UNIT TO BE SOAP TESTED.
04/12/2008 EXT METAL CLIPS/EXT SHEATHING MHENSON Approved IVRS - Inspection :*
04/24/2008 SHEET ROCK NAILING MHENSON Approved IVRS - Inspection :*
05/14/2008 PLUMBING - ABOVE CEILING RLEDONNE Approved IVRS - Inspection :*
05/16/2008 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
2C-2D OK TO ROCK & CEILING TILE
05/16/2008 BUILDING ABOVE CEILING MHENSON Approved IVRS - Inspection :*
NOTE GOODWILL UNDER TI PERMIT T08CM00187
05/16/2008 MECHANICAL - INTERMEDIATE MRAMBER Approved IVRS - Inspection :*
05/20/2008 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :*
06/06/2008 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED FOR "HOUSE METER" PER D. SANTACRUZ
07/01/2008 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
SUPPORT GFI RECEPTS ON ROOF
07/01/2008 PLUMBING - INTERMEDIATE RLEDONNE Approved IVRS - Inspection :*
UNCOVER ALL OUTSIDE CLEANOUTS AND MANHOLE
07/01/2008 STUCCO MESH MHENSON Approved IVRS - Inspection :*
EIFFS USED NOT 3 COAT STUCCO
07/01/2008 PLUMBING - SEWER HCS CONNECT RLEDONNE Approved IVRS - Inspection :*
07/01/2008 PLUMBING - GAS PRESS TEST FNL RLEDONNE Approved IVRS - Inspection :*
07/01/2008 ELECTRIC - OUTDOOR LIGHTING DSANTACR Approved IVRS - Inspection :*
07/01/2008 ELECTRIC - CONSTRUCTION POWER DSANTACR Approved IVRS - Inspection :*
07/01/2008 ELECTRIC - CABLE DROP DSANTACR Approved IVRS - Inspection :*
07/02/2008 BUILDING - PROGRESS MHENSON Approved IVRS - Inspection :*
07/02/2008 U VALUE FOR WINDOW MHENSON Approved IVRS - Inspection :*
07/03/2008 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FINAL SHELL ONLY
07/03/2008 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
07/03/2008 OUTDOOR LIGHTING FINAL DSANTACR Approved IVRS - Inspection :*
07/07/2008 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
07/07/2008 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
07/07/2008 RIGHT OF WAY - FINAL LLOPEZ Approved PER EMAIL
07/08/2008 NPPO - FINAL ACONNOR Approved
07/08/2008 LANDSCAPE - FINAL ACONNOR Approved
07/09/2008 BUILDING - FINAL MHENSON Approved IVRS - Inspection :*
MECH. EQUIPMENT WILL BE INSTALLED AT T.I IN VACANT UNITS
07/09/2008 FIRE SPKLR - FINAL LTHOMAS Approved
07/09/2008 FIRE - FINAL LTHOMAS Approved
08/01/2008 ENGINEERING - FINAL MAVERY Approved Need to repair small amount of asphalt.