Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2008 | ENGINEERING - FINAL | Approved | Need to repair small amount of asphalt. | |
| 07/18/2008 | ENGINEERING - FINAL | Partial Approval | Contractor needs to: 1- Provide letter from engineer per C.O.T. drainage manaul, chapter XIV, section 14.2(7). 2- Have engineer address drainage across HC ramp. 3- Address asphalt rear of rear of building. 4- Complete all concrete work southside of building. |