Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
12/04/2006
Applicant:
N/A
Description:
NEW CHURCH
Contractors:
  • FARWEST DEVELOPMENT AND CONSTRUCTION OF THE SOUT

Permit Reviews

Permit Number - T06CM06162
Permit Status: C of o
Permit Description: NEW CHURCH
Start Date Submittal Complete Date Status  
01/03/2008 RESUBMITTAL 01/29/2008 COMPLETED Review Details
01/29/2008 RESUBMITTAL 02/14/2008 COMPLETED Review Details
02/03/2010 REVISION - - 2ND 02/05/2010 COMPLETED Review Details
02/05/2010 REVISION - - 2ND 02/05/2010 COMPLETED Review Details
04/19/2007 RESUBMITTAL 05/14/2007 COMPLETED Review Details
05/24/2010 REVISION - SITE 05/24/2010 COMPLETED Review Details
08/19/2007 RESUBMITTAL 10/17/2007 COMPLETED Review Details
10/17/2007 RESUBMITTAL 11/19/2007 COMPLETED Review Details
10/30/2009 REVISION - - 1ST 11/17/2009 COMPLETED Review Details
11/17/2009 REVISION - - 1ST 11/20/2009 COMPLETED Review Details
11/19/2007 RESUBMITTAL 12/20/2007 COMPLETED Review Details
12/04/2006 PLANS OK TO SUBMIT - COMM 12/20/2006 COMPLETED Review Details
12/20/2006 COMMERCIAL NEW 02/09/2007 COMPLETED Review Details
12/20/2006 SITE 05/14/2007 COMPLETED Review Details
12/20/2007 RESUBMITTAL 01/03/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM06162
Permit Status: C of o
Permit Description: NEW CHURCH
Total Outstanding Activity Conditions - 1
Date Name
12/04/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM06162
Permit Description: NEW CHURCH
Total Completed Inspections - 40
Date Description Inspector Results Comments
04/29/2008 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
APPROVED RECEIVED OK FOR ABS
04/29/2008 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
04/29/2008 PLUMBING - PRE SLAB RRICH Approved IVRS - Inspection :*
04/30/2008 ELECTRIC - UFER RJIROUDE Approved IVRS - Inspection :*
07/11/2008 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
07/11/2008 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
07/11/2008 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
07/24/2008 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
2" FROM NEW METER LOCATION TO STUB UP AT BLD. PER REDLINE ON SITE P902
REVISED APPROVED PLAN AT LATER DATE WITH TIE INTO BLD AND METER AND BACKFLOW DEVICE
11/13/2008 ROOF NAILING GDABBS Approved IVRS - Inspection :*
07/07/2009 STUCCO MESH GDABBS Approved IVRS - Inspection :*
09/10/2009 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
1) SUSPENED ROUGH DUCT-OK TO PROCEED
2) CONDENSATE PIPING OK
09/16/2009 ELECTRIC - INTERMEDIATE JIROUDEK Approved 1. OK GROUNDING ELECTRODE INSTALL AT CONCRETE PAD FOR SWITCHGEAR
2. OK WALLS EXCEPT ELECTRIC ROOM & BACK STAGE AREA
09/22/2009 EXCAVATION/LAYOUT REBAR & ZON GDABBS Approved IVRS - Inspection :*
1) TRASH ENCLOSURE FOOTING-OK
10/01/2009 ELECTRIC - UNDERGROUND RJIROUDE Approved IVRS - Inspection :*
1) OK 3-4" PVC FROM SES TO TEP XFMR
2) INSTALL WARNING RIBBON PER NEC 300.5
10/01/2009 ELECTRIC - CABLE DROP RJIROUDE Approved IVRS - Inspection :*
11/24/2009 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
1) DWV THRU ROOF RESTROOM 104 WITH DRINKING FOUNTAIN, RECEPTION 102, MENS RESTROOM 120, WOMENS RESTROOM 121, STORAGE 122, DRINKING FOUNTAIN 101. WATER DISTRIBUTION SAME AREAS WATER TEST OK
12/01/2009 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
1) ALL PLUMBING WALLS EXCEPT JANITOR CLOSET ROOM #122
2) ROOM #119 AND ROOM #112
12/01/2009 FRAMING GDABBS Approved IVRS - Inspection :*
02/11/2010 ELECTRIC - TEMP POWER FOR TEST RJIROUDE Approved PER INSP COPY
03/15/2010 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
1) CORRECTIONS HAVE BEEN MADE
03/15/2010 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
03/24/2010 ELECTRIC - ABOVE CEILING RJIROUDE Approved IVRS - Inspection :*
03/29/2010 FIRE SPKLR - FINAL LTHOMAS Approved
03/29/2010 FIRE - ALARM FINAL LTHOMAS Approved
03/29/2010 FIRE - FINAL LTHOMAS Approved
04/14/2010 ENGINEERING - FINAL DROBERTS Approved WALKED THROUGH THE SITE AND LOOKED AT THE VEGITATION THAT IS REQUIRED FOR THIS SITE, ALL APPEARS TO BE HERE EXCEPT A COUPLE OF TREES AT THIS TIME. LANDSCAPING INSPECTION FOR THIS SITE WILL BE PERFORMED BY aNDREW cONNOR ON 4/15/2010.
04/15/2010 RIGHT OF WAY - FINAL MCASTRO Approved
04/30/2010 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
04/30/2010 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
05/10/2010 ELECTRIC - OUTDOOR LIGHTING RJIROUDE Approved IVRS - Inspection :*
05/12/2010 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
05/12/2010 ELECTRIC - FINAL RJIROUDE Approved IVRS - Inspection :*
06/07/2010 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
06/07/2010 PLUMBING - PROGRESS RRICH Approved IVRS - Inspection :*
06/08/2010 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
06/09/2010 LANDSCAPE - FINAL DROBERTS Approved PER INSP FINAL
06/09/2010 EXT METAL CLIPS/EXT SHEATHING GDABBS Approved PER BU FINAL
06/09/2010 STEM WALL/RETAINING WALL GDABBS Approved PER BU FINAL
06/09/2010 FIREWALL/FIREBARRIER/FIRESTOP GDABBS Approved PER BU FINAL
06/09/2010 BUILDING - PROGRESS GDABBS Approved PER FINAL

Documents

File Name Document Type  
C OF O_06-09-2010.TIF CERT OF OCC VIEW
SITE PLAN.TIF CONSTRPLANS VIEW
DUMPSTER DETAIL.TIF CONSTRPLANS VIEW
LANDSCAPE DEV PLAN.TIF CONSTRPLANS VIEW
IRR PLAN.TIF CONSTRPLANS VIEW
DETAILS.TIF CONSTRPLANS VIEW
INSTALLATION PROC.TIF CONSTRPLANS VIEW
COLUMN LOC PLAN.TIF CONSTRPLANS VIEW
DETAILS.TIF CONSTRPLANS VIEW
ROOF FRAMING PLAN.TIF CONSTRPLANS VIEW
FRAMING DETAIL.TIF CONSTRPLANS VIEW
WIND BENT FRAMING.TIF CONSTRPLANS VIEW
ENDWALL FRAMING.TIF CONSTRPLANS VIEW
MAIN FRAME.TIF CONSTRPLANS VIEW
G001.TIF CONSTRPLANS VIEW
G101.TIF CONSTRPLANS VIEW
FS0.0.TIF CONSTRPLANS VIEW
FS0.1.TIF CONSTRPLANS VIEW
FS1.0.TIF CONSTRPLANS VIEW
FS2.0.TIF CONSTRPLANS VIEW
FS3.0.TIF CONSTRPLANS VIEW
A000.TIF CONSTRPLANS VIEW
A101.TIF CONSTRPLANS VIEW
A104.TIF CONSTRPLANS VIEW
A105.TIF CONSTRPLANS VIEW
A109.TIF CONSTRPLANS VIEW
A111.TIF CONSTRPLANS VIEW
A201.TIF CONSTRPLANS VIEW
A301.TIF CONSTRPLANS VIEW
A302.TIF CONSTRPLANS VIEW
A303.TIF CONSTRPLANS VIEW
A304.TIF CONSTRPLANS VIEW
A401.TIF CONSTRPLANS VIEW
A402.TIF CONSTRPLANS VIEW
A501.TIF CONSTRPLANS VIEW
A502.TIF CONSTRPLANS VIEW
A503.TIF CONSTRPLANS VIEW
P001.TIF CONSTRPLANS VIEW
P101.TIF CONSTRPLANS VIEW
P102.TIF CONSTRPLANS VIEW
P401.TIF CONSTRPLANS VIEW
P501.TIF CONSTRPLANS VIEW
P901.TIF CONSTRPLANS VIEW
P902.TIF CONSTRPLANS VIEW
M001.TIF CONSTRPLANS VIEW
M101.TIF CONSTRPLANS VIEW
M102.TIF CONSTRPLANS VIEW
M501.TIF CONSTRPLANS VIEW
M502.TIF CONSTRPLANS VIEW
E001.TIF CONSTRPLANS VIEW
E101.TIF CONSTRPLANS VIEW
E111.TIF CONSTRPLANS VIEW
E121.TIF CONSTRPLANS VIEW
E122.TIF CONSTRPLANS VIEW
E511.TIF CONSTRPLANS VIEW
E512.TIF CONSTRPLANS VIEW
E521.TIF CONSTRPLANS VIEW
E522.TIF CONSTRPLANS VIEW
STRUCCALC_01.TIF DOCUMENTS VIEW
STRUCCALC_02.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW