Permit: T06CM03791
Permit Details
Apply Date:
06/27/2006
Applicant:
MICHAEL BECHERER
Description:
NEW: FIRE STATION
Contractors:
- SUNDT CONSTRUCTION
Permit Reviews
Permit Number - T06CM03791
Permit Status: C of o
Permit Description: NEW: FIRE STATION
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/22/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 01/23/2007 | COMPLETED |
| 06/27/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 06/27/2006 | COMPLETED |
| 06/27/2006 | 3RD PARTY REVIEW-COMMERCIAL | 08/28/2006 | COMPLETED |
| 08/09/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 08/09/2007 | COMPLETED |
| 08/28/2006 | POST 3RD PARTY REVIEW | 09/26/2006 | COMPLETED |
| 09/26/2006 | RESUBMITTAL | 10/23/2006 | COMPLETED |
| 12/20/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 12/22/2006 | COMPLETED |
| 12/22/2006 | POST 3RD PARTY REVIEW | 12/26/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM03791
Permit Status: C of o
Permit Description: NEW: FIRE STATION
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/27/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM03791
Permit Description: NEW: FIRE STATION
Total Completed Inspections - 49
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2006 | ELECTRIC - TEMPORARY SERVICE | DSANTACR | Approved | IVRS - Inspection :* |
| 11/02/2006 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER D. SANTACRUZ |
| 11/03/2006 | SITE - SEWER | RLEDONNE | Approved | IVRS - Inspection :* 1. VACUUM TEST OK 2. TEST REPORT PROVIDED |
| 11/28/2006 | STEM WALL/RETAINING WALL | AALEGRIA | Approved | IVRS - Inspection :* NORTH SECTION STEM WALLS, GRIDLINES 11/G-I, 1/11-5, 5/I-G HOSE TOWER 9/I-J, J/9-7, 7/I-J WEST SECTION OF STEM WALL F/1-3, 1/F-C, C/1-3 |
| 12/04/2006 | EXCAVATION/LAYOUT REBAR & ZON | AALEGRIA | Approved | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE APPROVAL BY DSD CITY OF TUCSON REVISION ON CHANGES OR ADD S1.2 SHEET |
| 12/06/2006 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* OK POWER CONDUITS FROM SES TO COLUMN LINE "E" INSIDE BLDG. |
| 12/18/2006 | PLUMBING - FINAL | RLEDONNE | Approved | 1. PROVIDE BACKFLOW PROTECTION FOR SODA GUNS AT BAV 2. PROVIDE BACKFLOW CERT |
| 12/21/2006 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* ROUGH SOIL PIPING TEST OK FOR ROOMS 124, 129, 130, 125, 148 & 144 |
| 12/29/2006 | REINFORCED MASONRY PRE-GROUT | AALEGRIA | Approved | IVRS - Inspection :* HOSE TOWER 24'-28' A.F.F.E D BOND BEAM ON 28' COLUMNS ON GRIDLINE F/1-3 8' A.F.F.E 3 COLUMNS COLUMNS ON GRIDLINE C/1-3 8' A.F.F.E AND 1 COLUMN 4' A.F.F.E |
| 02/14/2007 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* TRENCH DRAINS FOR WASHER ROOM #107 APPROVED PER APPROVED PLANS |
| 03/16/2007 | EXT METAL CLIPS/EXT SHEATHING | AALEGRIA | Approved | IVRS - Inspection :* |
| 04/30/2007 | FRAMING | AALEGRIA | Approved | IVRS - Inspection :* |
| 05/09/2007 | SHEET ROCK NAILING | AALEGRIA | Approved | IVRS - Inspection :* |
| 06/20/2007 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | IVRS - Inspection :* 1) OK PANEL MAKE UP-R, N, EM, ? AND M 2) NO BOND REQUIRED 3) RECEIVED LETTER OF TORQUE 4) PROVIDE LETTER OF APPROVAL FOR GEN. TEST |
| 06/20/2007 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
| 06/20/2007 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* |
| 06/22/2007 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* OK MULTI-USE & KITCHEN, DORM, HALLWAYS, WATCH ROOM 2035, 2010, 2005 APPROVED PER ADRIAN |
| 06/22/2007 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 06/22/2007 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 06/26/2007 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES FINISH FIRE WRAP ON GREASE DUCT |
| 06/27/2007 | BUILDING PRE-SLAB | AALEGRIA | Approved | |
| 06/27/2007 | BUILDING ABOVE CEILING | AALEGRIA | Approved | IVRS - Inspection :* |
| 07/06/2007 | SIGN - FINAL | JYBARRA | Approved | |
| 07/09/2007 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* |
| 07/09/2007 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 07/09/2007 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 07/10/2007 | ELECTRIC - CONSTRUCTION POWER | DSANTACR | Approved | |
| 07/10/2007 | ELECTRIC - CABLE DROP | DSANTACR | Approved | |
| 07/13/2007 | NPPO - FINAL | ACONNOR | Approved | |
| 07/13/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 07/13/2007 | RIGHT OF WAY - FINAL | SDAMRON | Approved | PER EMAIL |
| 07/16/2007 | FIRE - HYDRANTS | LLAKEY | Approved | |
| 07/16/2007 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 07/16/2007 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 07/16/2007 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 07/16/2007 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 07/20/2007 | ROOF NAILING | AALEGRIA | Approved | IVRS - Inspection :* |
| 07/20/2007 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* |
| 07/23/2007 | PLUMBING - SEWER HCS CONNECT | RLEDONNE | Approved | |
| 07/23/2007 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | |
| 08/02/2007 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* AIR BALANCE OK LEFT GAS CARD OK FOR FINAL |
| 08/02/2007 | MECHANICAL - PROGRESS | JMILITEL | Approved | IVRS - Inspection :* |
| 08/08/2007 | BUILDING - PROGRESS | AALEGRIA | Approved | |
| 08/10/2007 | BUILDING - FINAL | LHANLY | Approved | PER INSP COPY |
| 08/10/2007 | U VALUE FOR WINDOW | LHANLY | Approved | PER INSP COPY |
| 08/10/2007 | ENGINEERING - FINAL | JFEMLING | Approved | OK FOR TEMP C OF O PER INSP COPY |
| 08/10/2007 | ENGINEERING - FINAL | JFEMLING | Approved | Contractor needs an approved revised grading plan for outlet pipes from basin, all other items on previous punch list complete |
| 08/16/2007 | FIRE - KITCHEN EXH HOOD FINAL | LLAKEY | Approved | |
| 08/16/2007 | FIRE - FINAL | LLAKEY | Approved |