Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2007 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 04/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LIGHT POLE FOUNDATION (RFI PROVIDE SPECIFIC DETAILS FOR FOOTINGS STAMPED BY MARK S. TURNER P.E (STRUCTURE) ON DATE 2/25/05 -- INSPECTION COVER 8 LIGHT POLE FOOTINGS, REINFORCING, DEPTH AND CLEARANCES IN COMPLIANCE MUST SPECIAL INSPECTOR AT THE TIME OF CAST IN PLACE CONCRETE VERIFY CLEARANCES AND REMOVE EXTRA SOIL IN PLACE IN ACCORDANCE WITH THE SECTIONS ON CHAPTER 19 & 17 |
|
| 01/03/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PER SHEET S2.1 6-F-3 FOOTINGS @ B-8, 10 & 12 & C.8, 10 & 12 - 2- F6 FOOTINGS @ D 6 & 8 -- 1 F2 FOOTINGS @ D-4 - 3 - F7 FOOTINGS @ E6, 8 & 10 |
|
| 12/04/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE APPROVAL BY DSD CITY OF TUCSON REVISION ON CHANGES OR ADD S1.2 SHEET |
|
| 11/09/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* GRIDLINE G-3 1/2, A/8-12, D/3-11 E/11 3/4 - 3 + B/4-6 AND ALL CONT. FOUNDATION F1, F4/F2, F3, F5 FOOTINGS IN COMPLIANCE WITH LAYOUT S2.1 & SPEC S1.2 |
|
| 11/07/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NOTE: PROVIDE ADDRESS MUST BE POSTED 6810 GRIDLINE G/5-11 I/5-11 HOSE TOWER GRIDLINE 5/1-6, 11/1-G FOOTINGS F2 INCLUDED IN COMPLIANCE WITH APPROVED PLANS AND APPLICABLE DETAILS S2.1, S1.2 |