Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2007 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* MUST PROVIDE ALL SPECIAL INSPECTIONS REPORT FOR CMU/REINFORCED |
|
| 01/09/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GRIDLINE G/3-5, LINTEL LT4 32" DEEP 2 #5 TOP & BOTTOM |
|
| 01/05/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. LENTIL AT F-3 NORTH 2. HOSE TOWER TOP OUT |
|
| 01/04/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GRIDLINE 3/C-F TOPOUT P/C 2 3/4 TOPOUT GRIDLINE 4/LINTEL G/LINTEL |
|
| 01/03/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* @ CMU WALL 8FT TO 12FT AT GRIDLINE #3 FROM GRID C TO F AND WINGS AT BOTH ENDS C & F FROM #3 TOWARDS #2 |
|
| 01/02/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* HOSE TOWER 24FT TO 28FT 8" CMU WALL AT GRID LINE "G" FROM 5 TO 13 @ 15'4" OK TO GROUT |
|
| 12/29/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* HOSE TOWER 24'-28' A.F.F.E D BOND BEAM ON 28' COLUMNS ON GRIDLINE F/1-3 8' A.F.F.E 3 COLUMNS COLUMNS ON GRIDLINE C/1-3 8' A.F.F.E AND 1 COLUMN 4' A.F.F.E |
|
| 12/28/2006 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY-WEATHER CONDITIONS |
|
| 12/27/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOWER HOSE 4 SIDES 24' A.F.F.E GRIDLINE 11/I-G, GRIDLINE G/11-8 GRIDLINE F / 2 3/4-3 ABOVE DOOR, C/ 2 3/4-3 ABOVE DOOR, GRIDLINE 3/F-C 8' A.F.F.E |
|
| 12/26/2006 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 12/22/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GRIDLINE 3 1/2/3-4 8' A.F.F.E GRIDLINE F/2 3/4 - 3 8' A.F.F.E GRIDLINE 1/5-7 12' A.F.F.E GRIDLINE 11/1-G TOPOUT |
|
| 12/21/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* HOSE TOWER 16'-20' A.F.F.E PROVIDE REPORT FOR 12'-16' LIFT GRIDLINE 1/11-9 TOPOUT GRIDLINE G/11-5 8'-12' A.F.F.E GRIDLINE 1/B-F TOPOUT GRIDLINE E/3-4.25 10' A.F.F.E |
|
| 12/20/2006 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 12/19/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* HOSE TOWER 4 SIDES TO 12' A.F.F.E AND BOND BEAM GIRDLINE G/11-5 12' A.F.F.E GRIDLINE 5/G TO NORTH 8' ABOVE DOOR GRIDLINE 1/F-C 12' A.F.F.E |
|
| 12/18/2006 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. WALL G FROM 4 TO 5 @ 4 FT 2. WALL 4 FROM G TO D.5 @ 4FT 3. WALL E FROM 4 TO 3 TO 4 FT 4. WALL D.5 FROM 4 TO 3 TO 4FT 5. WALL #3 FROM C TO F @ 4FT 6. WALL #3.5 FROM D.25 TO D.75 |
|
| 12/15/2006 | REINFORCED MASONRY PRE-GROUT | Denied | IVRS - Inspection : See detailed listing on site.| 999* WORK COVERED WITHOUT INSPECTION NEED TO PROVIDE SPECIAL INSPECTION REPORT AND NAME OF THE INSPECTOR. |