Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address:
7880 S KOLB RD
Address NEW:
7880 S KOLB RD
Apply Date:
03/30/2006
Applicant:
TOM MEEHAN
Description:
NEW:INDUSTRIAL BUILDING AND SITE
Architects:
  • NELSON-SHIPLEY RANDI
Contractors:
  • A P N BUILDERS INC ,

Permit Reviews

Permit Number - T06CM01793
Permit Status: C of o
Permit Description: NEW:INDUSTRIAL BUILDING AND SITE
Start Date Submittal Complete Date Status  
03/30/2006 PLANS OK TO SUBMIT - SITE 03/30/2006 COMPLETED Review Details
03/30/2006 SITE 05/15/2006 COMPLETED Review Details
05/30/2006 RESUBMITTAL - SITE ALL 06/27/2006 COMPLETED Review Details
06/27/2006 RESUBMITTAL - SITE 11/01/2006 COMPLETED Review Details
06/30/2006 PLANS OK TO SUBMIT - 3RD PARTY 06/30/2006 COMPLETED Review Details
06/30/2006 3RD PARTY REVIEW-COMMERCIAL 07/25/2006 COMPLETED Review Details
07/13/2006 OTHER 07/13/2006 COMPLETED Review Details
07/25/2006 POST 3RD PARTY REVIEW 08/02/2006 COMPLETED Review Details
08/02/2006 OTHER 08/02/2006 COMPLETED Review Details
09/15/2006 3RD PARTY REVIEW-REVISION/OTHER 11/01/2006 COMPLETED Review Details
11/27/2006 3RD PARTY REVIEW-REVISION/OTHER 01/02/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM01793
Permit Status: C of o
Permit Description: NEW:INDUSTRIAL BUILDING AND SITE
Total Outstanding Activity Conditions - 1
Date Name
03/30/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM01793
Permit Description: NEW:INDUSTRIAL BUILDING AND SITE
Total Completed Inspections - 31
Date Description Inspector Results Comments
08/22/2006 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
WATER TEST WASTE & VENT BUILDING RESTROOM THRU 2-WAY CLEANOUT 5' EXTERIOR OF BUILDING OK
08/29/2006 PLUMBING - PRE SLAB RRICH Approved IVRS - Inspection :*
08/30/2006 ELECTRIC - UFER RMAJUTA Approved 20' #2 COPPER ATTACHED TO REBAR
09/28/2006 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
11/02/2006 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
WATER TEST WASTE & VENT OK
AIR TEST WATER PIPING FROM EXTERIOR STUB OUT THRU PER PLAN 100 PSI OK
11/03/2006 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
REVISED APPROVED PLAN ON SITE, WATER TEST THRU BUILDING 2-WAY CLEANOUT THRU 4" DIP TO MANHOLE OK
11/07/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
FROM METER THRU 1" RPBA INTO BUILDING AT SOUTH CENTER AND STUBBED TO SOUTHEAST CORNER. PROVIDE GOOD BEDDING & SHADING MATERIAL AROUND PIPNIG AND PROVIDE LETTER GIVING OK FOR PEX IN PLACE OF PVC SCH 40 FROM ENGINEER WITH HIS SEAL.
11/22/2006 ELECTRIC - INTERMEDIATE RSUBA Approved IVRS - Inspection :*
11/28/2006 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
12/12/2006 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR FINAL
12/12/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
12/12/2006 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
60 PSI TEST FROM METER PER PLAN TO APPLIANCE SHUT OFF VALVES.
12/12/2006 SIGN - FINAL JYBARRA Approved IVRS - Inspection : NEED TO REMOVE OR OBTAIN PERMIT FOR WALL SIGN; The occupancy inspection reveals that corrections are required. Please furni
12/12/2006 U VALUE FOR WINDOW GDABBS Approved IVRS - Inspection :*
12/12/2006 STUCCO MESH GDABBS Approved IVRS - Inspection :*
12/12/2006 FRAMING GDABBS Approved IVRS - Inspection :*
12/12/2006 ROOF NAILING GDABBS Approved IVRS - Inspection :*
12/12/2006 EXCAVATION/LAYOUT REBAR & ZON GDABBS Approved IVRS - Inspection :*
12/19/2006 ELECTRIC - FINAL RMAJUTA Approved PARTIAL SUBJECT TO BELOW -
1. FINAL SUBJECT TO APPROVAL OF KILN CONTROLLER AND CONVEYOR SYSTEM.

ALL ELECT. WORK OK
12/19/2006 ELECTRIC - FINAL RMAJUTA Approved IVRS - Inspection :*
1. MCC-2 PRIMARY ENTRY TO SW GEAR & FUSING OK, JB OK
2. MAIN DISCONNECT BLD J OK, UFER & BS OK
3. TRANSFER SW OK, GENERATOR OK
4. PNL HP OK, 45 KVA TRANS OK, PNL LP - OK
5. LIGHTING CONTACTOR OK
6. KILN CONTROL PNL NOT LISTED OR APPROVED BY ANY TESTING FACILITY, ELECTRICAL FEED TO IT OK
7. CONTROL ROOM OK
8. PLANT AREAS GENERAL DUTY OUTLETS OK
9. FINISH O/S FIXTURES
12/21/2006 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
WAITING ON LISTING & LABELING FOR GAS APPLIANCES
PER 2003 UPC, 2003 IMC & 2003 IFGC
12/21/2006 PLUMBING - GAS PRESS TEST FNL RRICH Approved IVRS - Inspection :*
01/30/2007 RIGHT OF WAY - FINAL SDAMRON Approved PER EMAIL
01/30/2007 LANDSCAPE - FINAL ACONNOR Approved
01/30/2007 NPPO - FINAL ACONNOR Approved
01/30/2007 FIRE - FINAL LTHOMAS Approved
02/14/2007 ENGINEERING - FINAL NKALAHAR Approved RCVD BASIN CERT
06/21/2007 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
OK FOR C OF O BASED ON PASSING ALL OTHER FINALS
06/22/2007 ELECTRIC - TEMPORARY SERVICE RHOLLAND Approved
06/22/2007 ELECTRIC - CABLE DROP RHOLLAND Approved
07/10/2007 PERMIT FINALED DROBEY Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
C OF O_07-10-2007.TIF CERT OF OCC VIEW
None SIGNS VIEW