Permit: T06CM01793
Permit Details
Apply Date:
03/30/2006
Applicant:
TOM MEEHAN
Description:
NEW:INDUSTRIAL BUILDING AND SITE
Architects:
- NELSON-SHIPLEY RANDI
Contractors:
- A P N BUILDERS INC ,
Permit Reviews
Permit Number - T06CM01793
Permit Status: C of o
Permit Description: NEW:INDUSTRIAL BUILDING AND SITE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/30/2006 | PLANS OK TO SUBMIT - SITE | 03/30/2006 | COMPLETED |
| 03/30/2006 | SITE | 05/15/2006 | COMPLETED |
| 05/30/2006 | RESUBMITTAL - SITE ALL | 06/27/2006 | COMPLETED |
| 06/27/2006 | RESUBMITTAL - SITE | 11/01/2006 | COMPLETED |
| 06/30/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 06/30/2006 | COMPLETED |
| 06/30/2006 | 3RD PARTY REVIEW-COMMERCIAL | 07/25/2006 | COMPLETED |
| 07/13/2006 | OTHER | 07/13/2006 | COMPLETED |
| 07/25/2006 | POST 3RD PARTY REVIEW | 08/02/2006 | COMPLETED |
| 08/02/2006 | OTHER | 08/02/2006 | COMPLETED |
| 09/15/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 11/01/2006 | COMPLETED |
| 11/27/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 01/02/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM01793
Permit Status: C of o
Permit Description: NEW:INDUSTRIAL BUILDING AND SITE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/30/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM01793
Permit Description: NEW:INDUSTRIAL BUILDING AND SITE
Total Completed Inspections - 31
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2006 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* WATER TEST WASTE & VENT BUILDING RESTROOM THRU 2-WAY CLEANOUT 5' EXTERIOR OF BUILDING OK |
| 08/29/2006 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
| 08/30/2006 | ELECTRIC - UFER | RMAJUTA | Approved | 20' #2 COPPER ATTACHED TO REBAR |
| 09/28/2006 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* |
| 11/02/2006 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* WATER TEST WASTE & VENT OK AIR TEST WATER PIPING FROM EXTERIOR STUB OUT THRU PER PLAN 100 PSI OK |
| 11/03/2006 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* REVISED APPROVED PLAN ON SITE, WATER TEST THRU BUILDING 2-WAY CLEANOUT THRU 4" DIP TO MANHOLE OK |
| 11/07/2006 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* FROM METER THRU 1" RPBA INTO BUILDING AT SOUTH CENTER AND STUBBED TO SOUTHEAST CORNER. PROVIDE GOOD BEDDING & SHADING MATERIAL AROUND PIPNIG AND PROVIDE LETTER GIVING OK FOR PEX IN PLACE OF PVC SCH 40 FROM ENGINEER WITH HIS SEAL. |
| 11/22/2006 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
| 11/28/2006 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 12/12/2006 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* OK FOR FINAL |
| 12/12/2006 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
| 12/12/2006 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* 60 PSI TEST FROM METER PER PLAN TO APPLIANCE SHUT OFF VALVES. |
| 12/12/2006 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection : NEED TO REMOVE OR OBTAIN PERMIT FOR WALL SIGN; The occupancy inspection reveals that corrections are required. Please furni |
| 12/12/2006 | U VALUE FOR WINDOW | GDABBS | Approved | IVRS - Inspection :* |
| 12/12/2006 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* |
| 12/12/2006 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
| 12/12/2006 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 12/12/2006 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* |
| 12/19/2006 | ELECTRIC - FINAL | RMAJUTA | Approved | PARTIAL SUBJECT TO BELOW - 1. FINAL SUBJECT TO APPROVAL OF KILN CONTROLLER AND CONVEYOR SYSTEM. ALL ELECT. WORK OK |
| 12/19/2006 | ELECTRIC - FINAL | RMAJUTA | Approved | IVRS - Inspection :* 1. MCC-2 PRIMARY ENTRY TO SW GEAR & FUSING OK, JB OK 2. MAIN DISCONNECT BLD J OK, UFER & BS OK 3. TRANSFER SW OK, GENERATOR OK 4. PNL HP OK, 45 KVA TRANS OK, PNL LP - OK 5. LIGHTING CONTACTOR OK 6. KILN CONTROL PNL NOT LISTED OR APPROVED BY ANY TESTING FACILITY, ELECTRICAL FEED TO IT OK 7. CONTROL ROOM OK 8. PLANT AREAS GENERAL DUTY OUTLETS OK 9. FINISH O/S FIXTURES |
| 12/21/2006 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* WAITING ON LISTING & LABELING FOR GAS APPLIANCES PER 2003 UPC, 2003 IMC & 2003 IFGC |
| 12/21/2006 | PLUMBING - GAS PRESS TEST FNL | RRICH | Approved | IVRS - Inspection :* |
| 01/30/2007 | RIGHT OF WAY - FINAL | SDAMRON | Approved | PER EMAIL |
| 01/30/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 01/30/2007 | NPPO - FINAL | ACONNOR | Approved | |
| 01/30/2007 | FIRE - FINAL | LTHOMAS | Approved | |
| 02/14/2007 | ENGINEERING - FINAL | NKALAHAR | Approved | RCVD BASIN CERT |
| 06/21/2007 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* OK FOR C OF O BASED ON PASSING ALL OTHER FINALS |
| 06/22/2007 | ELECTRIC - TEMPORARY SERVICE | RHOLLAND | Approved | |
| 06/22/2007 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | |
| 07/10/2007 | PERMIT FINALED | DROBEY | Approved |