Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2007 | ENGINEERING - FINAL | Approved | RCVD BASIN CERT | |
| 02/13/2007 | ENGINEERING - FINAL | Partial Approval | ALL ITEMS EXCEPT BASIN CERTIFICATION COMPLETE | |
| 01/30/2007 | ENGINEERING - FINAL | Denied | PRELIMINARY PUNCHLIST 1 COMPLETE ALL STRIPING WORK 2 PLACE SPLASH BLOCKS AT ALL ROOF DRAINS 3 RE-VEGETATE/STABILIZE ALL DISTURBED AREAS 4 COMPLETE RIP RAP AT BASIN OUTFALLS/OUTLETS 5 BASIN CERTIFICATION NEEDED FROM ENGINEER OF RECORD LEFT MESSAGE W/ WADE AT 360-2798 AFTER LEAVING SITE-MAY BE ADA ACCESSIBILITY ISSUES |