Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/26/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE PERMANENT LABEL ON 10 PSI TO OUNCES REGULATOR AT GENERATOR STATING 10 PSI TO THE ACTUAL DISCHARGE PRESSURE. 2. YOUR REGULATOR NEEDS TO BE VENTED FULL SIZE FROM THE VENT PORT ON IT TO EXTERIOR OF BUILDING, MINIMUM 5' FROM AIR INTAKES AND BE SUPPORTED PROPERLY. 3. REMOVE THE TEE FITTING AND PIPING DOWN STREAM OF REGULATOR THAT HAS THE VALVE & COPPER PIPING TO EXTERIOR |
|
| 06/21/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. VENT FROM REGULATOR AT GENERATOR TO TERMINATE TO EXTERIOR MINIMUM 5' FROOM ANY AIR INTAKE. |
|
| 12/21/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* WAITING ON LISTING & LABELING FOR GAS APPLIANCES PER 2003 UPC, 2003 IMC & 2003 IFGC |
|
| 12/13/2006 | PLUMBING - FINAL | Not ready for Inspection | 1. GAS PIPING TO GENERATOR TO BE SECURED PROPERLY SHALL PROVIDE APPROVED GAS FLEX FOR GENERATOR WITH LISTINGS FOR GAS USING EQUIPMENT ON SITE. 2. SHALL SECURE EXPANSION TANK AT WATER HEATER. 3. LANDSCAPING BACKFLOW PROTECTION DEVICE TO BE INSTALLED & CERTIFIED. 4. PROVIDE INSULATION ON WATER PIPING SUBJECT TO FREEZING. |