Permit: T06BU01541
Permit Details
Apply Date:
06/16/2006
Applicant:
TETRA TECH, INC
Description:
GRADING: ALDEA DEL NORTE
Contractors:
- VILANOVA DEVELOPMENT L L C
Permit Reviews
Permit Number - T06BU01541
Permit Status: Final
Permit Description: GRADING: ALDEA DEL NORTE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/19/2007 | RESUBMITTAL - GRADING | 02/14/2007 | COMPLETED |
02/14/2007 | GRADING | 02/20/2007 | COMPLETED |
06/16/2006 | PLANS OK TO SUBMIT - GRADING | 07/25/2006 | COMPLETED |
07/25/2006 | GRADING | 08/25/2006 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T06BU01541
Permit Description: GRADING: ALDEA DEL NORTE
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2007 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
03/01/2007 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) ADD ADDITIONAL TEMPORARY SEDIEMTN CONTROLS ALONG NORTH PERIMETER WHERE EXISTING FENCE IS MISSING PR WHERE A GAP EXISTS BETWEEN BOTTOM OF FENCE AND GRADE. 2) ENSURE CONTROLS IN PLACE ARE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION, UNTIL SITE IS STABILIZED. 3) DOCUMENT AND MAINTAIN STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP. 4) SWEEP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS. 5) INSTALL A DESIGNATED CONCRETE WASH OUT WHEN APPLICABLE. 6) POST A COPY OF YOUR SIGNED NOI ON SITE. |
03/22/2007 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN AND INSPECTOR RECOMENDATIONS. |
12/22/2008 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SIGNIFICANT STORM WATER CONCERNS NO ACTIVITY |
07/08/2011 | GRADING - FINAL | MRUSSO | Approved | SITE HAS ALOT OF SOIL EROSION OFF OF UNDEVELOPED AND UNSTABILIZED LOTS. THIS EROSION WILL CAUSE SILTING -IN OF RET/DET BASINS AND PREVENT STORM WATER FROM PENETRATING THE SOIL SURFACE. WEST BASIN HOLDING WATER >24 HOURS. |
10/05/2011 | GRADING - INTERMEDIATE | MRUSSO | Approved | INSPECTION CALLED IN TO KEEP PERMIT FROM EXPIRING, NO STORM WATER CONCERNS AT THIS TIME. |
06/28/2012 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
06/28/2012 | LANDSCAPE INSPECTION | MRUSSO | Approved |