Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
06/16/2006
Applicant:
TETRA TECH, INC
Description:
GRADING: ALDEA DEL NORTE
Contractors:
  • VILANOVA DEVELOPMENT L L C

Permit Reviews

Permit Number - T06BU01541
Permit Status: Final
Permit Description: GRADING: ALDEA DEL NORTE
Start Date Submittal Complete Date Status  
01/19/2007 RESUBMITTAL - GRADING 02/14/2007 COMPLETED Review Details
02/14/2007 GRADING 02/20/2007 COMPLETED Review Details
06/16/2006 PLANS OK TO SUBMIT - GRADING 07/25/2006 COMPLETED Review Details
07/25/2006 GRADING 08/25/2006 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T06BU01541
Permit Description: GRADING: ALDEA DEL NORTE
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/21/2007 NPPO PRE PERMIT INSPECTION ACONNOR Approved
03/01/2007 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved 1) ADD ADDITIONAL TEMPORARY SEDIEMTN CONTROLS ALONG NORTH PERIMETER WHERE EXISTING FENCE IS MISSING PR WHERE A GAP EXISTS BETWEEN BOTTOM OF FENCE AND GRADE.
2) ENSURE CONTROLS IN PLACE ARE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION, UNTIL SITE IS STABILIZED.
3) DOCUMENT AND MAINTAIN STORM WATER SELF INSPECTIONS REQUIRED BY YOUR SWPPP.
4) SWEEP ANY TRACKED MATERIAL OFF OF PUBLIC ROADWAYS.
5) INSTALL A DESIGNATED CONCRETE WASH OUT WHEN APPLICABLE.
6) POST A COPY OF YOUR SIGNED NOI ON SITE.
03/22/2007 STORMWATER INSTALL OF CONTROLS MRUSSO Approved SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN AND INSPECTOR RECOMENDATIONS.
12/22/2008 STORMWATER FOLLOW-UP INSP MRUSSO Approved NO SIGNIFICANT STORM WATER CONCERNS
NO ACTIVITY
07/08/2011 GRADING - FINAL MRUSSO Approved SITE HAS ALOT OF SOIL EROSION OFF OF UNDEVELOPED AND UNSTABILIZED LOTS. THIS EROSION WILL CAUSE SILTING -IN OF RET/DET BASINS AND PREVENT STORM WATER FROM PENETRATING THE SOIL SURFACE. WEST BASIN HOLDING WATER >24 HOURS.
10/05/2011 GRADING - INTERMEDIATE MRUSSO Approved INSPECTION CALLED IN TO KEEP PERMIT FROM EXPIRING, NO STORM WATER CONCERNS AT THIS TIME.
06/28/2012 STORMWATER FINAL INSPECTION MRUSSO Approved
06/28/2012 LANDSCAPE INSPECTION MRUSSO Approved

Documents

File Name Document Type  
APPROVED_001.TIF GRADING PLANS VIEW
APPROVED_002.TIF GRADING PLANS VIEW
APPROVED_003.TIF GRADING PLANS VIEW
APPROVED_004.TIF GRADING PLANS VIEW
TENTATIVE_001.TIF GRADING PLANS VIEW