Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2012 | GRADING - FINAL | Approved | ||
| 04/03/2012 | GRADING - FINAL | Continued | NOT READY, CALLED IN TO UPDATE PERMIT | |
| 07/08/2011 | GRADING - FINAL | Continued | SITE HAS ALOT OF SOIL EROSION OFF OF UNDEVELOPED AND UNSTABILIZED LOTS. THIS EROSION WILL CAUSE SILTING -IN OF RET/DET BASINS AND PREVENT STORM WATER FROM PENETRATING THE SOIL SURFACE. WEST BASIN HOLDING WATER >24 HOURS. | |
| 04/16/2007 | GRADING - FINAL | Correction Required | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. MAINTENACE OF SEDIMENT CONTROLS IS REQUIRED THROUGHOUT THE DURATION OF THE PROJECT. |