Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU01541
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/28/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
04/03/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
07/08/2011 | STORMWATER FOLLOW-UP INSP | Approved | ||
02/16/2011 | STORMWATER FOLLOW-UP INSP | Continued | GRADING PERMIT HAS BEEN RENEWED. SITE HAS NEW OWNER AND CONTRACTOR CONSTRUCTING TWO NEW HOMES. SITE IS STILL UNDER A STORM WATER PEMIT, HOWEVER THE PERIMETER OF THE SITE HAS BEEN HARDSCAPED. ALL CURBING, ACCESS ROADWAY , RET/DET BASINS AND PERIMETER FENCING HAS BEEN CONSTRUCTED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
04/29/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY ON SITE AND NO CHANGES SINCE THE LAST INSPECTION | |
02/10/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
12/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS NO ACTIVITY |
|
09/19/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
09/05/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH OWNER, SITE PERIMETER IS STABILIZED. HOWEVER, UNDEVELOPED LOTS NEED SEDIMENT CONTROLS TO PREVENT RUN-OFF FROM SILTING IN THE RET/DET BASINS. SITE ACCEPTS STORM WATER FROM THE DEVELOPMENT TO THE SOUTH - POTENTIAL FOR DRAINAGE PROBLEMS DUE TO RUN-ON EROSION. WEST BASIN HOLDS WATER >24 HRS. |
|
08/19/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. WEST BASIN HOLDS WATER > 24 HRS. |
|
05/21/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/12/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO STORM WATER CONCERNS, HOWEVER CONTRACTOR NEEDS TO COMPLETE SITE WORK TO INCLUDE RET/DET BASINS. BASINS NEED TO BE RE-WORKED (SILT REMOVED) AND BUILT PER THE APPROVED GRADING PLAN. NO WATER IN BASIN | |
11/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor placing AP on roadway, trucks not using contruction entrance, contractor placed AP at entrance so trucks would not track out. Contractor will sweep street as needed. | |
11/15/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-INSTALL STABILIZED CONSTRUCTION ENTRANCE UNTIL SITE IS PAVED. SWEEP UP TRACKING OFF OF COUNTRY CLUB RD. |
|
09/21/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH SUPERINTENDENT ON SITE (SHILO - STRUNCK CONSTR). ALL ITEMS LISTED ON THE PREVIOUS INSPECTION HAVE BEEN ADDRESSED. SEDIMENT CONTROLS MUST REMAIN IN PLACE AND BE MAINTAINED UNTIL THE SITE IS STABILIZED. |
|
09/13/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION REQUIRED: 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP ALONG THE EAST PERIMETER AND AT ALL OPENINGS AND CATCH BASINS. 2) PROVIDE A DESIGNATED CONCRETE WASH OUT ON SITE. 3) PROVIDE DOCUMENTATION OF ALL REQUIRED STORM WATER SELF INSPECTIONS. 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER PLAN. 5) POST A COPY OF YOUR NOI ON SITE. COMPLY BY 7 DAYS - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION AND A RE-INSPECTION FEE. |
|
08/10/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH ROCK ENTRANCE 2) RE-INSTALL SEDIMENT CONTROLS ALONG EAST AND NE CORNER OF SITE. 3) SWEEP UP TRACKING OFF OF COUNTRY CLUB |
|
07/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES TO SITE WORK, PERIMETER WALL CONSTRUCTED ALONG NORTH SIDE, RET/DET BASINS ROUGHED - IN, TEMP CONTROLS IN PLACE. | |
06/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME | |
05/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | ITEMS LISTED ON THE 4/30/07 INSPECTION (NOTICE OF VIOLATION) HAVE BEEN ADDRESSED. NO NEW STORM WATER CONCERNS AT THIS TIME. |
|
04/30/2007 | STORMWATER FOLLOW-UP INSP | Violation | NOTIICE OF VIOLATION ISSUED: 1) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT PER YOUR SWPPP. 10 DAY COMPLIANCE, NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER AND POSSIBLE CITATION. 2) MAINTAIN SEDIMENT CONTROLS ON SITE. |
|
04/20/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) PROVIDE A DESIGNATED CONCRETE/MATERIAL WASH OUT ON SITE. 2) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE EAST PERIMETER. 3) SWEEP UP TRACKING ON A ROUTINE BASIS. 7 DAY COMPLIANCE/ NON-COMPLIANCE WILL RESULT IN AN NOV. |
|
03/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) REPAIR SILT FENCE ALONG NORTH PERIMETER 2) POST A COPY OF YOUR NOI 3) INSTALL A DESIGNATED CONCRETE WASH OUT 4) RE-ESTABLISH STABILIZED ENTRANCE |