Permit: T05CM02361
Permit Details
Apply Date:
05/24/2005
Applicant:
REIGLE, RICHARD MICHAEL
Description:
REMODEL:INTERIOR -SAFEWAY
Architects:
- REIGLE, RICHARD MICHAEL
Permit Reviews
Permit Number - T05CM02361
Permit Status: Expired
Permit Description: REMODEL:INTERIOR -SAFEWAY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/24/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 05/24/2005 | COMPLETED |
05/24/2005 | 3RD PARTY REVIEW-COMMERCIAL TI | 07/05/2005 | COMPLETED |
07/05/2005 | POST 3RD PARTY REVIEW | 07/08/2005 | COMPLETED |
07/08/2005 | RESUBMITTAL | 07/18/2005 | COMPLETED |
07/13/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 09/27/2006 | COMPLETED |
08/15/2006 | OTHER | 08/15/2006 | COMPLETED |
11/09/2007 | POST 3RD PARTY REVIEW | 01/17/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM02361
Permit Status: Expired
Permit Description: REMODEL:INTERIOR -SAFEWAY
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/24/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T05CM02361
Permite Description: REMODEL:INTERIOR -SAFEWAY
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
BUILDING ABOVE CEILING | N/A | Not Inspected | ||
SHEET ROCK NAILING | N/A | Not Inspected | ||
BUILDING - FINAL | N/A | Not Inspected | ||
ELECTRIC - ABOVE CEILING | N/A | Not Inspected | ||
FIRE SPKLR - FINAL | N/A | Not Inspected | ||
FIRE - KITCHEN EXH HOOD FINAL | N/A | Not Inspected | ||
FIRE - FINAL | N/A | Not Inspected | ||
07/07/2008 | ELECTRIC - FINAL | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* HAVE ELECTRICAL CONTRACTOR GO THROUGH ENTIRE STORE ENSURE JOB IS 100% COMPLETE PER APPROVED PLANS AND MEETS NEC REQUIREMENTS |
08/10/2005 | ELECTRIC - INTERMEDIATE | N/A | Partial Approval | IVRS - Inspection :* 1) DELI WALL (NORTH) AND FLORAL CLOSET WALL |
Completed Inspections
Permit Status: Expired
Permit Number: T05CM02361
Permit Description: REMODEL:INTERIOR -SAFEWAY
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2005 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
08/29/2005 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR FINAL |
08/29/2005 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection :* |
08/29/2005 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
08/29/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
09/14/2005 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* 1) 12 PSI AIR TEST FROM METER (THRU BLDG 1 1/2") TO BOOSTER HEATER (3/4") AND 1 1/4 TO COMB OVEN OK 2) PROVIDE SAFETY CABLES TO ALL GAS APPLIANCES ON WHEELS 3) COMPLETE PIPING TO BOOSTER HEATER AT DISHWASHER AT LATER DATE TO BE VIEWED BY INSPECTOR PRIOR TO USE. PROVIDE PLUG AT SHUT OFF VALVE FOR BOOSTER HEATER PRIOR TO ENERGIZING GAS PIPING |
09/16/2005 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* INSTALLATION OF 3" TRENCH DRAIN IN BAKONG? OK |
10/21/2005 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
12/01/2005 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :*MET WITH CURTIS FROM EPS INFORMED HIM TO HAVE PLUMBER ON SITE AT NEXT INSPECTION CALL IN ALL UNAPPROVED INSPECTIONS PRIOR TO FINAL. HAVE RED LINES ON SITE WITH CITY APPROVED REVISED PLAN TO FOLLOW |
12/09/2005 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* WATER TEST FOR ADDITIONAL SINK IN BAKERY FOR HEALTH DEPT. REQUIREMENTS (OK) PENDING CITY APPROVED REVISED PLAN OF THIS AND SINK IN DELI SAME REQUIREMENTS - WATER TEST TRENCH DRAIN VENT - OK |