Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05CM02361

Parcel: 13338005E


Addresses:

10380 E BROADWAY BL


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T05CM02361

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
01/17/2008 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
REVISED APPROVED PLANS ON SITE

03090 - CALL IN THIS INSPECTION AND COMPLETE CORRECT INDIRECT DRAIN TERMINATION AT FLOOR SINK AT SODA DISPENSER
11/21/2007 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
WENT OVER WITH CURTIS REQUIREMENTS, WE WILL MEET AT FUTURE WITH ITEMS FROM 11/28/06 INSPECTION AND CONTINUE INSPECTION PROCESS
12/09/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER TEST FOR ADDITIONAL SINK IN BAKERY FOR HEALTH DEPT. REQUIREMENTS (OK) PENDING CITY APPROVED REVISED PLAN OF THIS AND SINK IN DELI SAME REQUIREMENTS - WATER TEST TRENCH DRAIN VENT - OK
12/05/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :* WATER TEST HAND SINK ADDED IN DELI AREA PER HEALTH DEPT.
PENDING RED LINE DRAWING OF INSTALLATION ON SITE WITH APPROVED PLAN TO FOLLOW WITH CORRECT SUPPORT OF OVERHEAD PIPING.
10/21/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
10/20/2005 PLUMBING - INTERMEDIATE Cancelled
10/20/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
09/29/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :* MEAT DEPT WATER TEST VENT TO POINT OF CORRECTION OK WATER PIPINGS MEAT DEPT OK. REVISED PLAN FROM 5/5/05 ENGINEERS STAMP IS RED LINE DRAWING TO BE APPROVED AT LATER DATE.
09/16/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
GAS FINAL CONNECTION TO DISHWASHER OK
2" VENT FROM 3" TRENCH DRAIN NEEDS CLEAN OUT TEE REPLACED IT IS CRACKED.
TEST ON VENT TO POINT OF CONNECTION OF EXISTING IS REQUIRED. TEST BALL LET GO.
RETEST REVENT IN MEAT DEPT AT SEAFOOD SINK
09/12/2005 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) CONTRACTOR TO PAY REFEE, OPEN SANITARY VENT ABOVE CEILING IN DELI. PROVIDE HANGERS AT 4' INTERVAL ON 2" VENT SAME AREA PER LAST INSPECTION REQUEST. NO WATER TEST ON VENT IN MEAT AREA FOR DA-108. OPEN VENT FROM DAIRY CASE. ALL WASTE AND VENT TO BE LEFT IN A SANITARY CONDITION AT END OF EACH WORK DAY. FINISH WORK AT SODA DISPENSER AREA PRIOR TO OPERATION OF SODA DISPENSER EQUIPMENT. INSTALL 1" CW PER PLAN IN MEAT AREA
09/09/2005 PLUMBING - INTERMEDIATE Partial Approval 1) VENTS FOR EAST DELI WATER TEST OK
2) SUPPORT HORIZONTAL VENT PIPING AT 4' INTERVALS IN CEILING FOR FLOOR SINKS AND DRINKING FOUNTAIN THIS AREA
09/07/2005 PLUMBING - INTERMEDIATE Cancelled
09/07/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
09/06/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) INSTALL H20 PIPING PER APPROVED PLAN, SECURE AND SUPPORT PIPING PROPERLY, PROVIDE ISOLATION (COPPER FROM STEEL STUDS) PROVIDE AIR OR WATER TEST ON VENT PIPING. SINKS ARE NOT TO BE USED INA ANY AREA UNTIL ROUGH, INTERMEDIATE AND FINAL INSPECTION IS APPROVED
08/30/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) PROVIDE PROOF OF 1" AIR GAP OR BACKFLOW PROTECTION FOR ICE MACHINE, NON CARBONATED BEVERAGE, COMBINATION OVENS, AND RE-THERMALIZER
08/29/2005 PLUMBING - INTERMEDIATE Cancelled
08/29/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
08/24/2005 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) REPAIR KINK IN H20 PIPING IN CEILING FOR FLORAL SINK. SUPPORT THIS PIPING AND VENT PIPING CORRECTLY
2) T/M COPPER OK (PER PLAN-MY MISTAKE)
08/23/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) WATER TEST LOOP VENT THRU AND JAINITRO SINK VENTT O 90 DEGREE POINT OF CONNECTION OK-FLORAL AREA PARTIAL
2) FOR SINK LOOP VENT TO BE LONG RADIUS FITTING UNDER SINK
3) H20 SUPPLY TO ISLAND SINK IN FLORAL TO BE T/L PER PLAN MP1.2-1.6
4) SUPPORT ALL OVERHEAD PIPING H20 AND VENT AT CORRECT INTERVAL PER TABLE 3.1 94 UPC
5) HOT AND HOT RETURN PIPING WILL REQUIRE 1" INSULATION PER MP1.2-1.14
07/21/2005 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*