Permit Details

Status:
C of o
Type:
COMMERCIAL ADDITION
Address NEW:
1145 E VALENCIA RD
Apply Date:
02/16/2005
Applicant:
HOLGUIN, GEORGE EDWARD
Description:
ADDITION:WAREHOUSE
Contractors:
  • CANBERRA CONSTRUCTION COMPANY L L C

Permit Reviews

Permit Number - T05CM00693
Permit Status: C of o
Permit Description: ADDITION:WAREHOUSE
Start Date Submittal Complete Date Status  
01/18/2006 RESUBMITTAL - SITE 01/24/2006 COMPLETED Review Details
01/23/2007 3RD PARTY REVIEW-REVISION/OTHER 05/16/2007 COMPLETED Review Details
02/16/2005 PLANS OK TO SUBMIT - COMM 02/16/2005 COMPLETED Review Details
02/16/2005 PLANS OK TO SUBMIT - SITE 02/16/2005 COMPLETED Review Details
02/16/2005 3RD PARTY REVIEW-COMMERCIAL 04/08/2005 COMPLETED Review Details
02/16/2005 SITE 03/28/2005 COMPLETED Review Details
04/08/2005 POST 3RD PARTY REVIEW 05/11/2005 COMPLETED Review Details
04/22/2005 RESUBMITTAL - SITE 06/17/2005 COMPLETED Review Details
04/25/2006 RESUBMITTAL - SITE 04/25/2006 COMPLETED Review Details
05/11/2005 RESUBMITTAL 06/17/2005 COMPLETED Review Details
05/16/2007 3RD PARTY REVIEW-REVISION/OTHER-2ND 05/16/2007 COMPLETED Review Details
05/18/2007 REVISION - SITE 05/18/2007 COMPLETED Review Details
09/26/2006 3RD PARTY REVIEW-REVISION/OTHER 09/27/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM00693
Permit Status: C of o
Permit Description: ADDITION:WAREHOUSE
Total Outstanding Activity Conditions - 1
Date Name
02/16/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T05CM00693
Permit Description: ADDITION:WAREHOUSE
Total Completed Inspections - 29
Date Description Inspector Results Comments
05/08/2006 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :
See detailed listing on site.| 999*
STOP WORK LIFTED PER S. LONG 5/8/06
1. YOU MUST IDENTIFY BUILDING PER PIMA COUNTY REQUIREMENTS. BUILDING CURRENTLY ADDRESSED AS 1143 E. VALENCIA - BUT PERMIT SAYS 1145.
2. PROVIDE GBR, PALCOMETER OR OTHER TEST RESULTS FROM A TUCSON RECOGNIZED 3RD PARTY INSPECTION AGENCY TO VERIFY FOOTING SIZES AND REBAR PLACEMENT. STANTEC DID ORIGINAL REVIEW IT MAY BE BEST TO USE THEM AGAIN.
3. PROVIDE ORIGINAL STANTEC INSPECTION REPORTS CONCERNING AS-BUILT INSPECTIONS.
05/30/2006 FRAMING LHANLY Approved IVRS - Inspection :*
I NEED REVISIONS TO PLAN FOR AS BUILT FOOTINGS & RETAINING WALLS BEFORE FRAME IS CALLED
06/06/2006 MECHANICAL - INTERMEDIATE CWILLIAM Approved IVRS - Inspection :*
08/07/2006 ELECTRIC - UFER DSANTACR Approved IVRS - Inspection :
See detailed listing on site.| 999*
PROVIDE REVISED PLANS PER NOTES INSP. 5/30/06
CONTR, INSTALLED 2 GROUND RODS 6' APART #4 GROUND ELECTRODE INTO BLD.
08/07/2006 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :
See detailed listing on site.| 999*
10/12/2006 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
1. INSTALL BREAKERS PER MANUF. OF PANEL
2. 240V OUTLETS IN WAREHOUSE MUST BE ON APPROVED PLANS. INSTALL GFI OUTLETS OVER SINK.
3. LIGHTING NOT PER PLAN. SEE NOTES LAST INSP.
11/13/2006 PLUMBING - YARD WTR LINE/TEST LHANLY Approved IVRS - Inspection :*
1. 1 1/4 TO GET VALVE IN BOX ON NORTHSIDE OK
2. NEW 1" METER AT STREET AND LENGTH OF PIPE FROM STREET TO GATE VALVE NOT INSTALLED.
11/13/2006 PLUMBING - INTERMEDIATE LHANLY Approved IVRS - Inspection :*
INTERIOR OK TO COVER
11/13/2006 PLUMBING - ROUGH, SOIL LHANLY Approved IVRS - Inspection :*
SEWER OK/DRAINS OK/4" SEWER INSTEAD OF 3"
11/29/2006 FIRE - FINAL LTHOMAS Approved
03/14/2007 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR FINAL
NO JOB CARD ON SITE
03/28/2007 STEM WALL/RETAINING WALL LHANLY Approved STEM PER REVISED
03/28/2007 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*
03/30/2007 PLUMBING - FINAL LHANLY Approved IVRS - Inspection :*
04/02/2007 PLUMBING - SEWER HCS CONNECT LHANLY Approved
04/02/2007 SITE - SEWER LHANLY Approved
05/21/2007 TEP CLEARANCE - PM JWEATHER Approved TMPP CLEARED PER L. HANLY VIA E-MAIL
05/21/2007 ELECTRIC - TEMPORARY SERVICE DSANTACR Approved
05/21/2007 ELECTRIC - CABLE DROP DSANTACR Approved
05/21/2007 SHEET ROCK NAILING LHANLY Approved
05/21/2007 U VALUE FOR WINDOW LHANLY Approved
06/11/2007 LANDSCAPE - FINAL ACONNOR Approved
06/11/2007 BUILDING - FINAL AALEGRIA Approved IVRS - Inspection :*
06/11/2007 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
06/12/2007 RIGHT OF WAY - FINAL LLOPEZ Approved PER EMAIL
06/15/2007 SIGN - FINAL JSONKIN Approved IVRS - Inspection :*
06/21/2007 ELECTRIC - TEMP POWER FOR TEST LHANLY Approved
06/22/2007 ENGINEERING - FINAL MAVERY Approved Contractor completed punch list.
06/25/2007 PERMIT FINALED LJACKSON Approved

Documents

File Name Document Type  
DESIGNREPORT.TIF DOCUMENTS VIEW
GEOTECHENGEVAL.TIF DOCUMENTS VIEW
HANDRAILDESIGN.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW
0693-01-0001-01-REVISION001.TIF CONSTRPLANS VIEW
0693-01-0001-01-REVISION3001.TIF CONSTRPLANS VIEW