Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* INTERIOR OK TO COVER |
|
| 08/07/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* READ NOTES FROM 5/30/06 AND COMPLY. EXPOSED CLEANOUT ON NORTH EXTERIOR BETWEEN 2' RETAINING WALL & SIDEWALK AND 90 DEG. TURN AT CLEANOUT IS NOT EXPOSED ENOUGH BUT DOES NOT APPEAR TO BE CORRECT DRAINAGE FITTING FOR APPLICATION. 1. SHALL EXPOSE ALL ROUGH SOIL PIPING (UNDERGROUND) WITH BUILDING DRAIN & BUILDING SEWER TO HCS CONNECTION. CALL IN 03005 FOR INSPECTION AND HAVE TEST IN PLACE WITH PERMIT & CITY APPROVED PLAN ON SITE. 2. SHALL POST CORRECT ADDRESS PERMIT IS FOR 1145 OR CORRECT ADDRESS ON PERMIT. 3. FAILURE TO COMPLY SHALL RESULT IN REFEE. |
|
| 06/09/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 05/30/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* CALL IN ROUGH SOIL INSPECTION 1ST AND GET APPROVAL THEN CALL IN ADDITIONAL INSPECTIONS. 1. EXPOSE BUILDING SEWER AT CLEAN OUT LOCATIONS AND AT HCS CONNECTION AT LEAST 5' IN LENGTH AT ALL AREAS. EXPOSE INTERIOR UNDERGROUND DRAINAGE AT RESTROOM, SINK AND FLOOR DRAIN. PROVIDE TESTING ON UNDERGROUND WASTE & VENT. 2. PROVIDE REVISED APPROVED SITE PLAN FOR BOTH WATER & SEWER WITH CORRECT CITY APPROVAL STAMP OR INSTALL PER APPROVED PLAN. 3. INSTALL INTERMEDIATE PLUMBING PER PLAN USING CORRECT DRAINAGE FITTINGS WITH TEST. EXPOSE PIPING AT SINK & FLOOR DRAIN FOR INSPECTION. 4. INSTALL ALL PIPING PER APPROVED PLAN OR HAVE REVISED. |
|
| 05/08/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |