Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T05CM00567
Permit Details
Apply Date:
02/09/2005
Applicant:
J R TUTTLE CO
Description:
TI:RETAIL
Contractors:
- J R TUTTLE CO
Permit Reviews
Permit Number - T05CM00567
Permit Status: Final
Permit Description: TI:RETAIL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/09/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 02/10/2005 | COMPLETED |
02/10/2005 | PLANS OK TO SUBMIT - SITE | 02/10/2005 | COMPLETED |
02/10/2005 | 3RD PARTY REVIEW-COMMERCIAL TI | 03/16/2005 | COMPLETED |
02/10/2005 | SITE | 03/16/2005 | COMPLETED |
03/16/2005 | POST 3RD PARTY REVIEW | 03/24/2005 | COMPLETED |
03/17/2005 | RESUBMITTAL - SITE | 03/24/2005 | COMPLETED |
03/24/2005 | RESUBMITTAL | 03/30/2005 | COMPLETED |
03/24/2005 | RESUBMITTAL - SITE | 03/30/2005 | COMPLETED |
06/22/2005 | REVISION | 07/13/2005 | COMPLETED |
09/13/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 09/13/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM00567
Permit Status: Final
Permit Description: TI:RETAIL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/09/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05CM00567
Permit Description: TI:RETAIL
Total Completed Inspections - 31
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2005 | ELECTRIC - TEMPORARY SERVICE | RSUBA | Approved | IVRS - Inspection :* |
06/20/2005 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :* |
07/05/2005 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1) AT SINK AND MOP SINK LOCATION P-6 P-7 CONTRACTOR TO INSTALL FLOOR CLEANOUT. HORIZONTAL CHANGE OF DIRECTION EXCEEDING 135 DEGREE REQUIRES CLEAN-OUT. WILL CHECK ON INTERMEDIATE 2) OK TO COVER 3) BATHROOM ROUGH-IN UNDER SLAB OK WATER TEST ONE RISER TO TEN FEET OK-OK TO COVER |
07/15/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :* 1-7/A-C OK FOR CONCRETE SLAB. |
07/29/2005 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* 1) WASTE AND VENT WATER TEST THRU ROOF CORRECTION MADE OK |
07/29/2005 | TEP CLEARANCE - AM | HLEYVA | Approved | ECO CLEARED BY SUBA |
08/03/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
08/04/2005 | ELECTRIC - TEMP POWER FOR TEST | RMAJUTA | Approved | OK ECO PER SUBA |
08/05/2005 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
08/31/2005 | ELECTRIC - ABOVE CEILING | RSUBA | Approved | IVRS - Inspection :* |
09/06/2005 | BUILDING ABOVE CEILING | LHANLY | Approved | IVRS - Inspection :* SOFFIT OK |
09/06/2005 | RIGHT OF WAY - FINAL | DLEE | Approved | PER EMAIL |
09/06/2005 | SIGN - FINAL | RDEAR | Approved | IVRS - Inspection :* |
09/06/2005 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
09/13/2005 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
09/16/2005 | FIRE - HYDRANTS | LTHOMAS | Approved | |
09/22/2005 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection :* |
09/29/2005 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* |
09/29/2005 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
09/29/2005 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* |
10/05/2005 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :*BLD INSPECTOR TO VIEW NORTH CENTER ROOF CORRECTION TO ROOF FOR RAIN DRAINAGE |
10/05/2005 | PLUMBING - ROOF DRAINS | RRICH | Approved | IVRS - Inspection :* |
10/05/2005 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
10/11/2005 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* DUCT DETECTORS HAVE BEEN TESTED PERMANENTLY IDENTIFY UNITS & DATA PLATES. WILL CHECK ON PHASE 2 OK FOR FINAL C OF O |
10/11/2005 | ENGINEERING - FINAL | DROBERTS | Approved | TEMPORARY C OF O FOR OCCUPANCY. FINAL NOT TO BE GIVEN UNTIL ALL EXTERIOR WORK IS COMPLETE. |
10/11/2005 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
10/11/2005 | FIRE SPKLR - FINAL | LTHOMAS | Approved | Approval for existing retail area only. |
10/11/2005 | FIRE - FINAL | LTHOMAS | Approved | Approval to occupy existing retail only. |
10/13/2005 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* 1) NO PERMANENT ADDRESS POSTED 2) NO ACCESSIBLE PARKING 3) ACCESSIBLE ROUTE OUT OF BLDG DOES NOT COMPLY WITH ANSI SECTION 705 4) PROVIDE ELECTRIC FINAL INSPECTION REPORT 5) PROVIDE FINAL INSP. REPORTS FROM AL LOT O INSPECTORS 6) SIGNAGE REQUIRED AT MAIN ENTRANCE DOORS "DOORS TO REMAIN UNLOCKED WHILE BLDG IS OCCUPIED" 7) ACCESSIBILITY SIGNAGE FOR RESTROOMS TO BE ON WALL AT LATCH SIDE OF DOOR 8) EXIT DOORS MUST UNLOCK FROM EGRESS SIDE 9) NOT OK FOR TCO |
10/13/2005 | LANDSCAPE - FINAL | ACONNOR | Approved | OK for Temp. C of O |
12/20/2005 | ELECTRIC - FINAL | RSUBA | Approved | IVRS - Inspection :*APPROVED |