Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T05CM00567
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/08/2006 | BUILDING - FINAL | Approved | PER DAVE MANN | |
01/20/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* VIOLATION OF SECTION 1106 OF IBC VIOLATION OF SECTION 3409.2 AND 3409.3 OF IBC |
|
01/10/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ADDRESS DISPLAY TO BE CONTRASTING COLOR 2) NO ACCESSIBLE PARKING IN NORTH LOT PARKING TO BE PROVIDED PER PLAN |
|
10/13/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO PERMANENT ADDRESS POSTED 2) NO ACCESSIBLE PARKING 3) ACCESSIBLE ROUTE OUT OF BLDG DOES NOT COMPLY WITH ANSI SECTION 705 4) PROVIDE ELECTRIC FINAL INSPECTION REPORT 5) PROVIDE FINAL INSP. REPORTS FROM AL LOT O INSPECTORS 6) SIGNAGE REQUIRED AT MAIN ENTRANCE DOORS "DOORS TO REMAIN UNLOCKED WHILE BLDG IS OCCUPIED" 7) ACCESSIBILITY SIGNAGE FOR RESTROOMS TO BE ON WALL AT LATCH SIDE OF DOOR 8) EXIT DOORS MUST UNLOCK FROM EGRESS SIDE 9) NOT OK FOR TCO |
|
10/12/2005 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE APPROVED FINALS FROM ELECTRICAL AND ENGINEERING INSPECTORS H. C PARKING HAS BEEN APPROVED BY DAVID MANN ANSI SECTION 705 TACTILE WARNING DEVICES TO BE INSPECTED BY ENGINEERING INSPECTOR. |
|
09/30/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
09/30/2005 | BUILDING - FINAL | Partial Approval | 1) FOR TCO TO STOCK ONLY 2) ACCESSIBLE PARKING REQUIRED 2) PEDESTRIAN PROTECTION OUT OF N.W. SHOW ROOM AND TEMP EMERGENCY EXIT ONLY SIGNS 3) ACCESSIBLE TOILET STALLS TO HAVE DOOR SWING IN |
|
09/29/2005 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* FOR TCO TO STOCK EAST END (EXISTING) BUILDING 1) CODE COMPLIANT ACCESSIBLE APRKING MUST BE IN PLACE. 2) COMPLETE ALL WORK AND REMOVE CONSTRUCTION EQUIPMENT FROM NON FENCED AREA. 3) ALL EXITS MUST BE CLEAR 4) BATHROOMS MUST BE FINISHED 5) OTHER INSPECTORS MUST SIGN OFF ON TCO 6) I WILL NOT INSPECT AN OCCUPIED BUILDING |