Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM00567
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/19/2006 | ENGINEERING - FINAL | Approved | STRIPING COMPLETE HANDRAIL IN PLACE |
|
01/12/2006 | ENGINEERING - FINAL | Approved | NO CHANGE IN SITE NO HANDRAIL IN ROW NO STRIPING WORK YET |
|
01/11/2006 | ENGINEERING - FINAL | Partial Approval | NO CHANGE IN SITE SINCE 1/10 HANDRAIL STILL NOT IN IN ROW NO STRIPING WORK HAS TAKEN PLACE |
|
01/10/2006 | ENGINEERING - FINAL | Partial Approval | SITE NOT COMPLETELY STRIPED. | |
01/09/2006 | ENGINEERING - FINAL | Partial Approval | Yes, he will need to provide hand railing on both sides of the sidewalk per COT Development Standards. It is considered a ramp. Richard Leigh Engineering Associate DOT, Engineering, Permits & Code Unit 201 N. Stone Ave, 4th Floor Tucson AZ, 85701 520-791-5100 Richard.Leigh@tucsonaz.gov >>> Nichole Kalahar 01/05/06 7:54 AM >>> Hello there Mr. Richard, This property is a unique site. It is a retro-fit of an old K-mart store. In order to comply with new development standards, a new P.A.A.L. was put in and striped going from the store front to Golf Links Rd. There is a tie in from the parking lot to the sidewalk along Golf Links Rd. That side walk is 5' wide and has about an 11% slope to it (14" of drop in 10' approx.). The site super is wondering if he should put hand railing in due to it's steepness. I am deferring his questions to you since it is in the R.O.W. Thanks, Nichole 240-0153 |
|
01/04/2006 | ENGINEERING - FINAL | Partial Approval | SIDEWALK LEADING FROM PAAL TO SIDEWALK ALONG NORTH SIDE OF PROJECT ALONG GOLF LINKS RD HAS 11% SLOPE (14" OF DROP IN 10' APROX) MADE RIGHT OF WAY AWARE VIA EMAIL 1/5/06 | |
10/11/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR OCCUPANCY. FINAL NOT TO BE GIVEN UNTIL ALL EXTERIOR WORK IS COMPLETE. | |
09/15/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORART C OF O APPROVED AT THIS TIME FOR STOCKING PURPOSES ONLY. ACCESS IS TO BE PROVIDED THROUGH THE LOADING DOCK FROM THE REAR OF THE BUILDING ONLY. | |
09/06/2005 | ENGINEERING - FINAL | Denied | COMPLETE ALL OF THE EXTERIOR WORK ON THIS SITE PRIOR TO RESCHEDULING ANOTHER INSPECTION FOR ENGINEERING. |