Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
9510 E 22ND ST
Address NEW:
9510 E 22ND ST
Apply Date:
05/25/2005
Applicant:
RICK ENGINEERING
Description:
GRADING
Contractors:
  • TL ROOF AND ASSOCIATES

Permit Reviews

Permit Number - T05BU01300
Permit Status: Final
Permit Description: GRADING
Start Date Submittal Complete Date Status  
02/23/2006 REVISION - GRADING 02/23/2006 ACTIVE Review Details
05/25/2005 PLANS OK TO SUBMIT - GRADING 05/25/2005 COMPLETED Review Details
05/25/2005 GRADING 06/20/2005 COMPLETED Review Details
07/27/2005 RESUBMITTAL - GRADING 08/31/2005 COMPLETED Review Details
08/31/2005 RESUBMITTAL - GRADING ALL 02/07/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05BU01300
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
Date Name
05/25/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T05BU01300
Permit Description: GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/10/2006 NPPO PRE PERMIT INSPECTION ACONNOR Approved
02/15/2006 ENGINEERING PRE-CONSTRUCTION NKALAHAR Approved MET WITH TL ROOF JIM CASEBOLT 975-3430 AND RICK SHERMAN WITH DAR HIL.

STORMWATER ORDINANCE GIVEN TO TL ROOF
02/21/2006 STORMWATER INSTALL OF CONTROLS NKALAHAR Approved SILT FENCE INSTALLED PER PLAN
STABILIZED CONSTRUCTION ENTRANCES INSTALLED
08/14/2006 STORMWATER FOLLOW-UP INSP NKALAHAR Approved SITE IS PARTIALLY PAVED
CURBING BEING INSTALLED ALONG OLD SPAN TRL
12/13/2006 GRADING - INTERMEDIATE NKALAHAR Approved PICS 1804-1806
CHANGES TO RAMP NOT ON MY SET OF PLANS
EMAIL TO LAITH FOR GUIDANCE
12/20/2006 GRADING - FINAL NKALAHAR Approved SITE NOT READY FOR FINAL GRADING

PRELIMINARY PUNCH LIST FOR PART OF THE SITE ONLY:

-STABILIZE ALL DISTURBED AREAS (BLDG 3 AND 4)
-SWEEP SITE AND GENERAL CLEAN UP

SHEET 2:
-INSTALL 6' CONCRETE WALKWAY W OF CATCH BASIN
-INSTALL 6' WIDE CONCRETE PEDESTRIAN ACCESS PER KEYNOTE 4 S OF BLDG 4 TO OFFICE MAX
-GRADES DO NOT APPEAR TO MATCH DELTA 1 ELEVATIONS

SHEET 3:
-INSTALL 6' WIDE CONCRETE PEDESTRIAN ACCESS ON NORTH SIDE OF OFFICE MAX PER KEYNOTE 4
-INSTALL SPILLWAY PER PLAN K/8 SW OF BLDG 3 KEYNOTE 22
-INSTALL CURBING PER KEYNOTE 31
-STRIPE PARKING AREA SW CORNER PER PLAN

SHEET 6:
-BUILD SIDEWALK FROM OLD SPANISH TRL TO PARKING AREA PER PLAN-OR SUBMIT REVISIONS FOR COT APPROVAL-INCLUDING RETAINING WALL AND CHANGES TO GRADE (ELEVATIONS)
-STRIPE ALL PARKING SPACES PER PLAN

BASIN CERFICATION (DRAINAGE STRUCTURES) STILL NEEDED
04/20/2007 STORMWATER FINAL INSPECTION NKALAHAR Approved
05/01/2007 LANDSCAPE INSPECTION ACONNOR Approved
06/28/2007 PERMIT FINALED NKALAHAR Approved