Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU01300

Parcel: 136087950


Addresses:

9510 E 22ND ST


Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T05BU01300

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
06/06/2007 GRADING - FINAL Approved BASIN CERTIFICATION RCVD
COPY TO BASIN FILES ALSO
05/01/2007 GRADING - FINAL Approved approved

Nichole,

If you are ready to accept the project, I will support you. It looks like they have done all we had asked them to do.


>>> Nichole Kalahar Zormeier 05/01/2007 8:23 AM >>>
Laith,

I may have missed the response to this email. I received a call from Jerry Clark with TL Roof today wondering where we stand.

Thoughts?

Thanks,

Nichole
240-0153

>>> Nichole Kalahar Zormeier 04/20/2007 1:22 PM >>>
Laith,

I am attaching pictures from today. Jerry says that they re-scarified the basin and with a site level ensured positive drainage from East to West and North to South so water should get to outlet pipe.

I have no concerns at this point with giving final approval, as long as all of your conditions have been met. Have they?

Nichole
04/20/2007 GRADING - FINAL Partial Approval SEE PICS 2163-2164
WEIR HAS BEEN WIDENED
BASIN HAS BEEN RE-SCARIFIED
PER JERRY SITE LEVEL INDICATES POSITIVE DRAINAGE EAST TO WEST AND NORTH TO SOUTH TO BLEEDER PIPE
04/16/2007 GRADING - FINAL Not ready for Inspection MET WITH JERRY AND KEVIN ONSITE
PICS 2142-2143
STANDING WATER MONDAY AFTER SMALL RAIN EVENT FRIDAY
03/22/2007 GRADING - FINAL Not ready for Inspection MET WITH LAITH REGARDING SITE
REVIEWED AS BUILTS
02/23/2007 GRADING - FINAL Continued T05CM05318 AND T06CM02528 BOTH APPROVED

OUTSTANDING GRADING ISSUES HAVE BEEN ADDRESSED ON SITE
pics 2039-2044
CHECKING WITH LAITH FOR ANY OUTSTANDING PPW FROM ENGINEERING FIRM-REVISED PLANS
02/21/2007 GRADING - FINAL Continued TALKED TO JASON
C OF O'S TO BE CALLED IN FOR DRESS BARN AND SHELL
WENT DOWNTOWN TO TALK TO LAITH ABOUT ANY OUTSTANDING DOCUMENTATION/PLAN INFO HE NEEDS TO GIVE C OF O-PREPARE TO CLOSE OUT GRADING
02/16/2007 GRADING - FINAL Continued MET AND WALKED SITE WITH JASON
BASIN TO BE SCARIFIED-SHOTS HAVE ALREADY BEEN TAKEN
02/14/2007 GRADING - FINAL Continued MET WITH LAITH DOWNTOWN
DISCUSSED MEET WITH TL ROOF (JERRY) AND ENGINEER (EDUARDO)
LAITH ADVISED CAN SUPPORT TEMP C OF O FOR DRESS BARN
AS LONG AS
BASIN ISSUES ARE ADDRESSED (SHOTS AND GRADE TO DRAIN)
WATER CONVEYANCE INTO NEW DRAINAGE CHANNEL IS ADDRESSED
RETAINING WALL IS EXTENDED AT CHANGED WALKWAY
02/09/2007 GRADING - FINAL Continued EMAIL TO LAITH FOR CLARIFICATION ON OUTSTANDING GRADING PLAN ISSUES
01/04/2007 GRADING - FINAL Not ready for Inspection ALL OUTSTANDING GRADING ISSUES HELD TO T05BU01300

T05CM05318 DRESS BARN/T06CM05219 TBA/T06CM06071 TBA ARE BEING HELD FOR SITE WORK COMPLETION
12/20/2006 GRADING - FINAL Not ready for Inspection SITE NOT READY FOR FINAL GRADING

PRELIMINARY PUNCH LIST FOR PART OF THE SITE ONLY:

-STABILIZE ALL DISTURBED AREAS (BLDG 3 AND 4)
-SWEEP SITE AND GENERAL CLEAN UP

SHEET 2:
-INSTALL 6' CONCRETE WALKWAY W OF CATCH BASIN
-INSTALL 6' WIDE CONCRETE PEDESTRIAN ACCESS PER KEYNOTE 4 S OF BLDG 4 TO OFFICE MAX
-GRADES DO NOT APPEAR TO MATCH DELTA 1 ELEVATIONS

SHEET 3:
-INSTALL 6' WIDE CONCRETE PEDESTRIAN ACCESS ON NORTH SIDE OF OFFICE MAX PER KEYNOTE 4
-INSTALL SPILLWAY PER PLAN K/8 SW OF BLDG 3 KEYNOTE 22
-INSTALL CURBING PER KEYNOTE 31
-STRIPE PARKING AREA SW CORNER PER PLAN

SHEET 6:
-BUILD SIDEWALK FROM OLD SPANISH TRL TO PARKING AREA PER PLAN-OR SUBMIT REVISIONS FOR COT APPROVAL-INCLUDING RETAINING WALL AND CHANGES TO GRADE (ELEVATIONS)
-STRIPE ALL PARKING SPACES PER PLAN

BASIN CERFICATION (DRAINAGE STRUCTURES) STILL NEEDED