Permit: T04CM05071
Permit Details
Apply Date:
11/18/2004
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
RESTAURANT/CONVENIENCE STORE/GAS STATION
Architects:
- RICE, KIRKE WOODARD
Contractors:
- TRIUMPH BUILDERS SOUTHWEST LLC *C*
Permit Reviews
Permit Number - T04CM05071
Permit Status: C of o
Permit Description: RESTAURANT/CONVENIENCE STORE/GAS STATION
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2005 | POST 3RD PARTY REVIEW | 04/04/2005 | COMPLETED |
03/10/2005 | RESUBMITTAL - SITE ALL | 04/04/2005 | COMPLETED |
03/29/2006 | 3RD PARTY REVIEW-REVISION/OTHER-2ND | 03/30/2006 | COMPLETED |
05/25/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 05/31/2006 | COMPLETED |
07/07/2005 | RESUBMITTAL | 10/12/2005 | COMPLETED |
10/12/2005 | RESUBMITTAL | 11/04/2005 | COMPLETED |
11/18/2004 | PLANS OK TO SUBMIT - 3RD PARTY | 11/24/2004 | COMPLETED |
11/18/2004 | PLANS OK TO SUBMIT - SITE | 11/18/2004 | COMPLETED |
11/18/2004 | SITE | 12/01/2004 | COMPLETED |
11/24/2004 | 3RD PARTY REVIEW-COMMERCIAL | 02/08/2005 | COMPLETED |
12/01/2004 | SITE | 01/07/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM05071
Permit Status: C of o
Permit Description: RESTAURANT/CONVENIENCE STORE/GAS STATION
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/18/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T04CM05071
Permit Description: RESTAURANT/CONVENIENCE STORE/GAS STATION
Total Completed Inspections - 35
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2005 | ELECTRIC - TEMPORARY SERVICE | RSUBA | Approved | IVRS - Inspection :*OK TO CLEAR TEMP SERVICE FOR CONST POWER. TEMP POLE |
11/09/2005 | TEP CLEARANCE - AM | JWEATHER | Approved | TEMP-POWER POLE PER R. SUBA |
11/23/2005 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection :*6- FLOOR BOXES PVC & FEED 2-2" PVC 8-3/4" BRANCH CIRCUITS 1--2 1/2 PVC STUBBED OUT OF BUILDING |
11/29/2005 | ELECTRIC - UFER | RSUBA | Approved | IVRS - Inspection :*WEST & NORTH SIDE POLE BASE FEEDERS OK |
11/29/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :* |
12/20/2005 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* 2 1/2" T/C IS SUPPLIED FOR WATER SERVICE ENTRY STUBBED UP T OUT 10' OF BUILDING 60 PSI AIR TEST OK -- TYPE K IS SPEC. INSTALL FOR SPEC. OR PROVIDE SEALED LETTER FROM ENGINEER GIVING OK FOR T/2 1/2" TO ISLAND ALSO STUBBED OVER AT OWN RISK |
12/22/2005 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :*FRONT SLAB & TOE DOWN OK |
12/22/2005 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* |
12/30/2005 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :* 1) MAIN ROOF OK; RAFTER AND CONNECTS AT PORCH OK, NEED TO SEE T1-11 NAILED OFF |
12/30/2005 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection :* 1) REAR AND SIDES OK; OK TO CLOSE COLUMNS; LT STRAPS NOT IN. LEDGER SPLICE REQUIRED PER KEY NOT 8 PP 53 |
01/18/2006 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
01/24/2006 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | WATER TEST THRU ROOF WASTE VENT OK 2) CLOSET FLANGES OK |
01/24/2006 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
01/30/2006 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
02/03/2006 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* |
03/17/2006 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES |
04/19/2006 | ELECTRIC - SERVICE RELOCATION | RSUBA | Approved | IVRS - Inspection :* |
05/05/2006 | ELECTRIC - CABLE DROP | RMAJUTA | Approved | IVRS - Inspection :* NO CLEARANCE REQUIRED. |
05/05/2006 | PLUMBING - GAS PRESS TEST FNL | BBENEDON | Approved | IVRS - Inspection :* NOT REQUIRED - APPROVED ACCORDING TO REVISED PLAN OF 11-14-05 GAS PIPING HAS BEEN DELETED. NO GAS PIPED. NOT A REQUIRED INSPECTION. |
05/05/2006 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
05/05/2006 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection :* |
05/12/2006 | FIRE - HYDRANTS | LTHOMAS | Approved | |
05/18/2006 | ELECTRIC - ABOVE CEILING | RSUBA | Approved | IVRS - Inspection :* |
05/18/2006 | ELECTRIC - FINAL | RSUBA | Approved | IVRS - Inspection :* |
05/19/2006 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection :* |
05/24/2006 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* OK FOR FINAL |
05/24/2006 | RIGHT OF WAY - FINAL | NBRIGGS | Approved | PER EMAIL |
05/25/2006 | FIRE - FINAL | LTHOMAS | Approved | |
05/26/2006 | HEALTH DEPT - FINAL 724-7908 | RPAYTON | Approved | |
05/30/2006 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* 15 IN HOUSE BACKFLOW CERTIFICATIONS TURNED IN. |
05/31/2006 | BUILDING - FINAL | LHANLY | Approved | |
06/27/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | |
07/19/2007 | ENGINEERING - FINAL | NKALAHAR | Approved | BASIN CERTIFICATION RECEIVED FROM TONY TSANG |
07/26/2007 | SIGN - FINAL | JSONKIN | Approved | IVRS - Inspection :* |
08/09/2007 | PERMIT FINALED | LJACKSON | Approved |