Permit: T04CM05071

Parcel: 14044009G


Addresses:

7710 S WILMOT RD


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T04CM05071

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
05/12/2006 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
INSTALL OF 2 1/2" RPB AT METER IS OK
03/30/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1/2 COPPER CONTINUED TO ISLAND WATER STATION/AIR STATION STUBBED UP 60 PSI TEST OK
03/28/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
CONNECTION TO INTERCEPTOR DOWN STREAM, INTERCEPTOR VENT, AND BACK WATER VALVE INSTALLATION DOWN STREAM OF BUILDING SEWER & INTERCEPTOR DISCHARGE PARTICAL PENDING REVISED APPROVED PLAN OF THIS INSTALLATION COVER AT OWN RISK.
03/24/2006 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
INVERT OF VENT SHALL BE TAKEN OFF ABOVE THE FLOW LINE OF SEWER.
03/21/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1/2" SOFT UPPR FROM BUILDING EXTERIOR CENTER EAST BY H2O SERVICE VALVE BOX NORTH TO METER LOCATION 60 PSI TEST PARTIAL. WILL SEE CONTINUATION OF THIS TO AIR/WATER STATION AT LATER DATE.
03/16/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
2 1/2" PVC SCH 40 YARD WATER PIPING FROM METER LOCATION TO EXISTING SERVICE VALVE 50 PSI WATER TEST OK
1. NEED TO SEE CONNECTION TO METER WITH CORRECT BACKFLOW ASSEMBLY INSTALL. HAVE YOUR ENGINEER PROVIDE INFORMATION ON CORRECT BACKFLOW SIZE. SITE & PLUMBING PAGE ARE IN CONFLICT.
03/15/2006 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
PROVIDE MINIMUM 50 PSI AIR OR WATER TEST ON 2 1/2" YARD PIPING.
03/14/2006 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1. P2 PAGE SHOWS 2 1/2 CW SUPPLY TO BUILDING. SITE PLAN 2A OF 3 SHOWS 1 1/2 RP WITH 1 1/2 SUPPLY TO BUILDING. CODE REQUIREMENT IS RP AND BUILDING SUPPLY TO BE OF EQUAL SIZE. PLEASE PROVIDE CORRECT INFORMATION ON YARD WATER SIZING.
2. PROVIDE MINIMUM 50 PSI AIR OR LINE PRESSURE WATER TEST.
03/02/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" SITE SEWER FROM BUILDING EXTERIOR & DISCHARGE OF INTERCEPTOR TO AREA OF PUBLIC MANHOLE 5PSI AIR TEST OK
1. NEED TO VIEW CONNECTION TO BUILDING & INTERCEPTOR AND FLEXIBLE CONNECTION WITHIN 3' OF MANHOLE BASE.
4" GREASE WASTE FROM (2) 2" AT BUILDING TO INTERCEPTOR WATER TEST OK
1. NEED TO SEE CONNECTIONS (2) AT BUILDING
OK TO COVER INTERCEPTOR
02/23/2006 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
02/21/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4TH SDR 35 FROM WYE CONNECTION FOR BUILDING AND GREASE INTERCEPTOR WITH CLEANOUTS AT CORRECT INTERVALS TO AREA OF COMBO FOR PUBLIC SEWER.
1. WILL NEED AIR TEST, VERIFICATION OF GRADE INSPECTION OF BUILDING TIE IN, PUBLIC SEWER TIE IN AND BACKWATER VALVE INSTALL.
2. SHALL REQUIRE AUTHORIZATION TO DISCHARGE INTO NEW 8" PUBLIC SEWER YET TO BE CONSTRUCTED.
02/16/2006 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
APPROVED PLAN IS ON SITE. INSTALLATINO IS TO APPROVED PLAN BUT DOES NOT MEET 94 UPC FOR MAXIMUM DISTANCES BETWEEN CLEANOUTS. CLEANOUTS SHALL BE INSTALLED NOT TO EXCEED 100' MAXIMUM INCLUDING RISE TO GRADE. PROVIDE CORRECT TRACER WIRE WITH CLEANOUT PER PIMA COUNTY DETAIL WWM 401.
02/09/2006 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1. SITE SEWER REQUIRES STAMPED CITY APPROVED PLAN
2. PROVIDE CORRECT TRACER WIRE PER STATE STATUE
3. PROVIDE VERIFICATION OF GRADE FROM SURVEYOR OR ENGINEER
4. PROVIDE AIR OR WATER TEST
12/20/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
2 1/2" T/C IS SUPPLIED FOR WATER SERVICE ENTRY STUBBED UP T OUT 10' OF BUILDING 60 PSI AIR TEST OK -- TYPE K IS SPEC. INSTALL FOR SPEC. OR PROVIDE SEALED LETTER FROM ENGINEER GIVING OK FOR T/2 1/2" TO ISLAND ALSO STUBBED OVER AT OWN RISK
11/29/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*6 PSI AIR TEST ( 2) 2" GREASE WASTE STUB UP & OUT OF BUILDING TO 2' AFF. (1) 2" INTERCEPTOR VENT AIR TEST STUBBED UP & OUT OF BUILDING 2' AFF OK
REVISED CITY APPROVED PLAN ON SITE. PRESLAB OK
11/28/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
11/16/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) 6" AIR TEST ON UNDERGROUND PER REVISION <1> DATED 9/30/05 QUIZNOS REVIEW, SHALL SERVE AS RED LINE
2) NEED TO SEE REVISED APPROVED PLAN WITH TRAP PRIMERS, TEST ON (2) 2" GREASE WASTE STUBS AND INTERCEPTOR VENT PRIOR TO CONCRETE COVER AT OWN RISK