Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T04CM03394
Permit Details
Apply Date:
07/22/2004
Applicant:
LECHNER CONSTRUCTION INC ,
Description:
BANK:NEW
Contractors:
- LECHNER CONSTRUCTION INC ,
Permit Reviews
Permit Number - T04CM03394
Permit Status: C of o
Permit Description: BANK:NEW
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/06/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 05/13/2005 | COMPLETED |
07/22/2004 | PLANS OK TO SUBMIT - COMM | 07/30/2004 | COMPLETED |
07/22/2004 | PLANS OK TO SUBMIT - SITE | 07/23/2004 | COMPLETED |
07/27/2004 | SITE | 11/16/2004 | COMPLETED |
07/30/2004 | 3RD PARTY REVIEW-COMMERCIAL | 11/08/2004 | COMPLETED |
11/08/2004 | POST 3RD PARTY REVIEW | 11/16/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM03394
Permit Status: C of o
Permit Description: BANK:NEW
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/22/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T04CM03394
Permit Description: BANK:NEW
Total Completed Inspections - 44
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2005 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :* |
04/29/2005 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | IVRS - Inspection :* 1) HCS CONNECTION IS OK. 2) OK TO BACKFILL TRENCH. 3) NOTE: SHALL PROVIDE A PERM CAP @ TEST WYE |
05/05/2005 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* |
05/13/2005 | ELECTRIC - UFER | RMAJUTA | Approved | IVRS - Inspection :* |
05/23/2005 | ELECTRIC - UNDERGROUND | RMAJUTA | Approved | IVRS - Inspection :* 1) 3/4" FEEDER DRIVE THRU TELLER AND 4" PVC OK TO COVER |
05/31/2005 | ELECTRIC - CONSTRUCTION POWER | RMAJUTA | Approved | IVRS - Inspection :* |
06/07/2005 | ELECTRIC - PROGRESS | RMAJUTA | Approved | IVRS - Inspection :* OK TO CLEAR TEMP POWER FOR CONSTRUCTION. METER BASE & PANEL CHANGED. NEEDS TO BE RECLEARED |
06/14/2005 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :* |
06/21/2005 | TEP CLEARANCE - AM | JKOZUCH | Approved | CEC |
06/24/2005 | PLUMBING - ROOF DRAINS | RRICH | Approved | IVRS - Inspection :* WATER TEST RAIN DRAIN ALL AREAS OK |
06/28/2005 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :* |
06/30/2005 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection :* |
07/06/2005 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection :* WATER TEST & VENT THRU ROOF OK H20 PIPING WATER TEST OK. |
07/06/2005 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
07/08/2005 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
07/14/2005 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* |
07/14/2005 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
07/21/2005 | ELECTRIC - TEMP POWER FOR TEST | RMAJUTA | Approved | OK ECO BOND POSTED PER SUBA |
08/15/2005 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* 1) CHECKED CONDENSATE DRAINS, DUCT ABOVE CEILING 2) OK FOR CEILING TILES |
08/15/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
08/16/2005 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
08/16/2005 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
08/16/2005 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
08/16/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :* |
08/16/2005 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
08/16/2005 | BUILDING ABOVE CEILING | LHANLY | Approved | IVRS - Inspection :* |
08/23/2005 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* 1) OK TO TILE |
08/29/2005 | SIGN - FINAL | RDEAR | Approved | IVRS - Inspection :* |
08/29/2005 | RIGHT OF WAY - FINAL | DLEE | Approved | PER EMAIL TEMP ONLY |
09/02/2005 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR FINAL C OF O |
09/02/2005 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
09/02/2005 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
09/02/2005 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
09/02/2005 | FIRE - FINAL | LTHOMAS | Approved | |
09/02/2005 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
09/08/2005 | OUTDOOR LIGHTING FINAL | RSUBA | Approved | IVRS - Inspection :* |
09/09/2005 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* 1) (2) BACKFLOW CERTIFICATIONS TURNED IN 2) BACTERIA REPORT TURNED IN |
09/09/2005 | ELECTRIC - FINAL | RSUBA | Approved | IVRS - Inspection :* |
09/09/2005 | PLUMBING - FINAL | LHANLY | Approved | OK FOR TEMP C OF O PER INSP REMARKS |
09/15/2005 | ENGINEERING - FINAL | DROBERTS | Approved | |
09/15/2005 | LANDSCAPE - FINAL | ACONNOR | Approved | |
09/19/2005 | BUILDING - PROGRESS | LHANLY | Approved | |
09/19/2005 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
02/15/2006 | PERMIT FINALED | LJACKSON | Approved |